ML19309F034
| ML19309F034 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 04/14/1980 |
| From: | Harold Denton Office of Nuclear Reactor Regulation |
| To: | Vonzellen B NORTHERN ILLINOIS UNIV., DE KALB, IL |
| Shared Package | |
| ML19309F035 | List: |
| References | |
| NUDOCS 8004280362 | |
| Download: ML19309F034 (2) | |
Text
__.
DRO Phe
.y***Cu
- -7.
...c.
UNITED STATES 6 j
NUCLEAR REGULATORY COMMISSION
- 3. g, e g ef.,5 WAsmNG TON, 0. C. 20555
\\M' f,(/
APR 141980 Docket No. 50-10 Professor Bruce W. von Zellen, Ph.D.
Northern Illinois University De Kalb, Illinois 60115
Dear Dr. von Zellen:
Your letter dated March 19, 1980 indicates that you did not receive our response to your June [23] 1979 letter. We have reviewed our files on this matter and have determined that we received a letter from you dated June 25,1979 and respcnded to you with a letter dated July 25, 1979. We have enclosed a copy of your June 25 letter and our July 25 response for your information. Our files do not reflect the receipt of a letter from you dated June 23, 1979.
With respect to your recuest for the preparation of an Environmental Impact Statement for the Dresden Unit 1 decontamination, the Nuclear Regulatory Comission is fully cormitted to satisfying all requirements of the National Environmental Policy Act (NEPA).
Our regulations which implement the NEPA requirements are contained in Title 10, Part 51.5, of the United States Code of Federal Regulations. These regulations are in conformance with gJidelines issued by the President's Council on Environmental Quality which were in effect prior to July 30, 1979. They identify the following types of actions for which NRC must prepare an environmental impact statement:
"(1) Issuance of a permit to construct a nuclear power reactor, testing f acility, cr fuel reprocessing plant pursuant to Part 50 of this chapter; (2) Issuance of a full power or design capacity license to operate a nuclear pcwer reactor, testing f acility, or fuel reprocessing plant pursuant tc Part 50 of this chapter; (3) Issuance of a permit to construct or a design capacity license to operate an isotopic enrichment plant pursuant to 50.22 of this chapter; (4) Issuance of a license to possess and use special nuclear material for processinc and fnal f;Lrication, scrap recovery, or conversion of uranium i safluoride pursuant to Part 70 of this chapter; (5) Issuance of a license to possess and use source material for uranium milling or prduction of uranium hexafluoride pursuant to Part 40 of this chapter; (6) Issuance of a license authorizing cotmerical radioactive waste disposal by land burial pursuant to Parts 30, 40, and/or 70 of this chapter; 8004280
Dr. von Zellen (7) Conversion of a previsional cperating license for a nuclear poser reactor, testing f acility or fuel reprocessing plant to a full power or design capacity license pursuant to Part 50 of this chapter where no final enviror. mental impact statement has been previously prepared; (8) Issuance of a license to ranufacture pursuant to Appendix M of Part 50 of this Chapter; (9) Amendments of Parts 30 and 40 of this chapter concerning the exemption from licensing and regulatory requirements of any equip-ment, device, comodity or other product containing byproduct materidl or source material; and (10) Any other action which the Comission determines is a major Comission action significantly affecting the quality of the human envi ronment. "
The Comission is presently in the process of modifying our Environmental Protection regulations to take into account, voluntarily, the regulations promulgated by CEQ which became effective July 30, 1979. We have concluded that this action is not one of these actions requiring an environmental impact statement under current Comission regula ions.
While our regulations do not require the preparation of an environmental impact statement, we are evaluating the environmeni.al impact of the proposed action to determine whether an environmental impact statement should be prepared because of specific circumstances related to this particular action.
If it is determined that an environmental inpact statement need not be prepared, a negative declaration and environmental impact appraisal will be prepared in accordance with Sections 51.7 and 51.50(d) of our regu-lations for environmental protectien.
We will complete our review and issue the appropriate statement er appraisal prior to the Dresden decontamination.
I hope that this is responsive to your request.
)
Sincerely, l
OdM n-d Er E. ". 2 :
rold R. Denton, Director Office of Nuclear Reactor Regulation
Enclosures:
1.
June 25, 1979, Letter Dr. von Zellen to NRC 2.
July 25,1979, Letter NRC to Dr. vcn Zellen