Forwards IE Insp Repts 50-338/80-07 & 50-339/80-05 on 800102-18,24-25 & 0131-0201 & Notice of Violation
ML19309E786
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 03/03/1980
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Ferguson J
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML19309E787 List:
References
NUDOCS 8004240393
Download: ML19309E786 (2)


See also: IR 05000338/1980007

Text

77c

,,

UNITED STATES

N' .33 f

!

o,7,

NUCLEAR REGULATORY COMMISSION

ffrf

,

g

9 r

REGION ll

'f

101 MARIETTA ST., N.W., SUITE 3100

0,

g

b

o

ATLANTA, G EORGIA 30303

In Reply Refer To:

RII:HSK

m 0 31980

50-338/80-07

50-339/80-05

,

Virginia Electric and Power Company

ATTN:

J. H. Ferguson

Executive Vice President-Power

P. O. Box 26666

Richmond, VA 23261

,

Gentlemen:

This refers to the inspection conducted by M. S. Kidd of this office on January 2

through 18, and 24, 25 and January 31-Februa7 1,1980 of activities authorized by

NRC License No. NPF-4 and Construction Permit No. CPPR-78 for the North Anna Power

Station facility, and to the discussion of our findings held with W. R. Cartwright

at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

During the inspection it was found that certain activities under your license

appear to be in noncompliance with .NRC requirements. This item and references

to pertinent requirements are listed in the' Notice of Violation enclosed herewith

as Appendix A.

Corrective actions to prevent recurrence were completed prior to

the conclusion of this inspection; therefore, a reply is not requested.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis af o*.ich it is claimed that

the information is proprietary, and should be prg, m

so that proprietary

information identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

i

8004240

-

.

.

.

.

Virginia Electric and Power Company

-2-

MAR 0 31930

t

Should you have any questions concerning this letter, we will be glad te discuss

them with you.

.

Sincerely,

R. C. Lewis, Acting Chief

Reactor Operations and Nuclear

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

.

2.

Inspection Report Nos. 50-338/80-07

and 50-339/80-05

cc w/ encl:

W. R. Cartwright, Station Manager

Box 402

Mineral, VA 23117

P. G. Perry

Senior Resident Engineer

P. O. Box 38

Mineral, VA 23117

s

>

.

,

.

-

- -