Forwards IE Insp Repts 50-566/80-04 & 50-567/80-04 on 800219-22.No Noncompliance Noted
ML19309E297
Person / Time
Site: Yellow Creek  Tennessee Valley Authority icon.png
Issue date: 03/04/1980
From: Bryant J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19309E299 List:
References
NUDOCS 8004210116
Download: ML19309E297 (2)


See also: IR 05000566/1980004

Text

f

T

,

g#o

M -gg

anug

UNITED STATES

8

g

NUCLEAR REGULATORY COMMISSION

h

o

,

3

.E

REGION 11

o

101 MARIETTA ST

N.W., SulTE 3100

o

ATLANTA, GEORGIA 30303

.....

MAR

4 1980

In Reply Refer To:

RII:MJG

50-566/80-04

50-567/80-04

Tennessee Valley Authority

ATTN:

II. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

'

This refers to the inspection conducted by M. J. Gouge of this office on

February 19-22, 1980 of activities authorized by NRC Construction Permit

Nos. CPPR-172 and CPPR-173 for the Yellow Creek Nuclear Plant facility,

and to the discussion of our findings held with M. M. Price at the con-

clusion of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report.

Within these areas, the inspection con-

sisted of selective examinations of procedures and representative records,

interviews with personnel, and observations by the. inspectors.

Within the scope of this inspection, no items of noncompliance were

disclosed.

We have examined actions you have taken with regard to previous,1y

identified enforcement matters. These are discussed in the enclosed

inspection report.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter

and the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

I

such information from public disclosure. Any such application must

I

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained

i

!

in a separate part of the document.

If we do not hear from you in this

I

regard within the specified period, the report will be placed in the

Public Document Room.

.

-

8004210nlo

. . .

.

I

..

.

MAR

4 1980

Tennessee Valley Authority

-2-

.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

,

C. B

nt, Acting

ief

.

Reactor Construction and

Engineering Siipport Branch

Enclosures:

1.

Inspection Report Nos. 50-566/80-04

and 50-567/80-04

-

cc w/ encl:

'

J. F. Cox

400 Commerce Street

W10C131 C-K

Knoxville, TN 37902

l

M. M. Price, Project Manager

P. O. Box 2000

Inka, MS 38852

D. L. Terrill, Project Engineer

'

400 Chestnut Street Tower II

Chattanooga, TN 37401

E. G. Beasley

Tennessee Valley Authority

309 Grant's Building

Knoxville, TN 37902

,,

.

,

.

at