Text
, . .
,
,
.
-
.
. - .
.-
--.
-
-
- ._
.
.
.
-
2
-
,
.
'
-
'
UNITED STATES
h$
ATOMIC ENERGY COMMISSION
,,
1 -l g, . *
).
.
DIRECTOHATE OF REGULATORY OPERATIONS
l
,
.g
g
aEGion n. - suite eia
i
\\/
AFH 0% p
230 58E ACHT RE E ST RE ET. NOR T HwEST
,,L,,,,,,,
,,,,,,,,,,,,,
AT L. A N T A, G E oRG I A 30 30 3
In Reply Refer To:
RO:II:HSK
,
50-313/74-14
gu a g $1
- ~
i
Arkansas Power and Light Company
ATTN:
Mr.'J. D. Phillips
'
Senior Vice President
Sixth and Pine Streets
.
Pine Bluff, Arkansas
71601
Gentlemen:
This refers to the inspection conducted by Mr. M. S. Kidd and other nembers
of-this office on November 5-8 and November 14, 1974, of activities authorized
,
by AEC Operating License No. DPR-51 for the Arkansas Nuclear One, Unit 1
J
facility, and to the discussion of our findings held by Messrs. G. L. Troup
on November 7, M. S. Kidd on November 8 and L. L. Beratan on November 14,
1974, with Mr. J. W. Anderson. Also, the report refers to a telephone
discussion held by Mr. W. Britz with Mr. J. W. Anderson on November 13,
1974,.'concerning the results of the independent measurements program.
Areas examined dur/ng the inspection and our findings are discussed in the
enclosed inspection report. .Within these areas, the inspection consisted
of selective examination of procedures and representative records,
'
"
interviews with personnel, and observations by the inspector.
4
The results of our iollowup of previously identified matters are
I
contained in the enclosed report as follows:
,
'
1
a.
The results of our inspection of your corrective action on previously
- .
identified violations are discussed in Section II of the summary of
the enclosed report.
,
b.
The status of unresolved items identified in previous inspection
reports is discussed in Section IV of the summary of the enclosed report.
,
'New unresolved items are identified in Section III of the summary of.the
enclosed report.
4
During the insper. tion, it was found that certain activities under your
license appear to be in violation of AEC requirements. The violatiom
,
i .
and references r; pertinent requirements are listed in Section 7. of
(
the summary of the enclosed report.
8004110
.
-9
'
,-
,
-
.
.,m..
.
,_,_-.m
,...,,,..._...,a.-
- , , . , - -- , ,. - - -
.
.
.
r
,
g
'
Arkansis Power and Light Company
-2-
[{0V 7. 01974
-
.
This notice is sent to you pursuant to the provisions of Section 2.201
of the AEC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations. Section 2.201 requires you to submit to this office,
within 20 days of your receipt of this notice, a written statement
or explanation in reply including:
(1) corrective steps which have
been taken by you, and the results achieved; (2) corrective steps which
will be taken to avoid further violations; and (3) the date when full
compliance will be achieved.
In accordance with Section 2.790 of the AEC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the
'
enclosed inspection report will be placed in the AEC's Public Document
Room. If this report contains any information that you believe to be
proprietiry, it is necessary that you submit a written application to
this office requesting that such information be withheld from public
disclosure. If no proprietary information is identified, a written
statement to that effect should be submitted. If an application is
submitted, it must fully identify the bases for which information is
claimed to be proprietary. The application should be prepared so that
information sought to be withheld is incorporated in a separate paper
and referenced in the application since the application will be placed
D
in the Public Document Room. Your application, or written statement,
should be submitted to us within 20 days.
If we are not contacted as
specified, the enclosed report and this letter may then be placed in the
-
Public Document Room.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Very tr*11y yours,
'
.
,
,
/
%
lN.'c E!?
,/ f
,,.s
c2
'm
/
f
.
-
bormanC.Moseley
Director
Enclosure:
RO Inspection Report No.
50-313/74-14
h
a
-.
. ..
, . . . . .
. - . .. . . -
. - . . . - .
_.
. . - - .
. .
- -
.
.
. ..
.
!
.
,
.
,_
t
=
r
'
=
-
.
6
.
.
J
l
j.
.
Ltr to Arkansas Power and Light Company fm N. C. Moseley dated NOV ? 919M
and RO Inspection Report No. 50-313/74-14
a
DISTRIBUTION:
H. D. Thornburg, RO
RO:HQ (5)
'
'
,
Directorate of Licensing (13)
i
Regulatory Standards
i
DR Central Files
- PDR
,
!
- Local PDR
I
- NSIC
- State
l
- To be dispatched at a later date
.
l
-
1
i
i
t
i
i
i
t
3
.,
1
i
i
i
i
i
e
','
j
- ,r
, , '
,w.<---
!-
I-
03M3E'd
. .
. . .
. . . -
.
.
-
... .. . .
.
.
. _ . _ , .
_ _ . _ , . _ _ . _ - _ . . _ _ . _ . . _ - _ _ , . . , _ _ - _ _ , . . _ _ _ _