ML19309D844

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-313/74-11 on 740625-27 & 0730-0806. Noncompliance Noted
ML19309D844
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 09/09/1974
From: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Phillips J
ARKANSAS POWER & LIGHT CO.
Shared Package
ML19309D838 List:
References
NUDOCS 8004110703
Download: ML19309D844 (4)


See also: IR 05000313/1974011

Text

.

'

. , ;* , '

.

<- .

9

.

1

.

Ltr to Arkansas Power and Light Company fm N. C. Moseley

dtd

SEP 9

E74

DISTRIBUTION:

H. D. Thornburg, RO

HQ (4)

Directorate of Licensing (4)

DR Central Files

  • PDR

,

  • NSIC
  • State

.

  • To be dispatched at a later date

.

t

goo #, *103

C)

O

e

.

-

,

3

-

,,

-

.

,

M.% Q g

UNITED STATES

.

' I'[ 'n .)

ATOMIC ENERGY COMMISSION

J

\\

/

rg.' ] ".1

9tPE:T(HATM OF S;ULATGnY OPERATICH3

l

.

aco o ii .

si.". m

'(Ng@,~

,

w i.e .s.

. n c sr n c t v . mm r .- sr

, , . . . . .

....u..m.

aii.4,.ra,atoacia

>) sh

,

,

In Reply Refer To:

SEP 9

1974

RO:II:MSK

50-313/74-11

Arkansas Power and Light Company

ATTN:

Mr. J. D. Phillips

Senior Vice President

Sixth and Pine Streets

Pine Bluff, Arkansas

71601

Gentlemen:

This refers to the inspection conducted by Mr. M. S. Kidd of this office

'

on June 25-27 and July 30 - August 6, 1974, of activities authorized by

AEC Operating License No. DPR-51 for the Arkansas Nuclear One, Unit 1

facility, and to the discussion of our findings held by Mr. Kidd with

.

~

Mr. J. W. Anderson and members of his staff at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted

of selective avn=4 nation of procedures and representative records,

interviews with personnel, and observations by the inspector.

The results of our followup of previously identified matters are contained

in the enclosed report as follows:

The results of our inspection of your corrective action on previously

a.

identified violations are discussed in Section II of the summary of

i

the enclosed report.

'

b.

The status of unresolved items identified in previous inspection

reports is discussed in Section IV of the summary of the enclosed

report.

New unresolved items are identified in Section III of the summary of the

enclosed report.

,

During the inspection it was found that certain activities under your

license appear to be in violation of AEC requirements. The viols. ions

and references to pertinent requirements are listed in Section I of

j

the summary of the enclosed report.

-s

x

/

-

!

1

. . -_ . . - - -. .- . __ _- . -

. .

. . - . _ _ - . .

_- __- -__

.

-

.

_

.

- .

-

I

.

,

,

'

m

-

.

,

Ar' kansas Power and Light

-2-

SEP 9

1974

i

company

,

.

.

This notice is sent to you pursuant to the provisions of Section 2.201

i

of the AEC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Section 2.201 requires you to submit to this office,

j'

within 20 days of your receipt of this notice, a written statement

-

or explanation in reply including:

(1) corrective steps which have

been taken by you, and the results achieved; (2) corrective steps

'

which will be taken to avoid further violations; and (3) the date

when full compliance will be achieved.

No. response is requested regard-

ing items I. A.1, I.A.2.c. (1), I. A.2.c. (2), and I. A.2.c. (3) in that

.

corrective actions were completed prior to the conclusion' of the

inspection.

In accordance with Section 2.790 of the AEC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the AEC's Public Document

. Room. If this report contains any information that you believe to be

l

-

proprietary, it is necessary that you submit a written application to

'

this office requesting that such information be withheld from public

disclosure. If no proprietary information is identified, a written

statement to that effect should be submitted. If an application is

submitteu, it must fully identify the bases for which information is

O

claimed to be proprietary. The application should be prepared so that

information sought to be withheld is Naporated in a separate paper

,

and referenced in the application sir e w e application will be placed

in the Public Document Room. Your application, or written statement,

should be submitted to us within 20 days. If we are not contacted as

specified, the enclosed report and this letter may then be placed in the

Public Document Room.

4

Should you have any questions concerning this letter, we will be glad

i

to discuss them with you.

Very truly yours,

,

>

-

Norman C. Mossley

kDirector

1

'

Enclosure:

RO Inspection Report No.

'

50-313/74-11

!

{

G

me.

m

3

y-

4

w-

+T---

y

g-

g-

e

e

--

-

%

-v

m-w

-

wyen-

u

w--


m

m -

ew'-*

w--

-'ew"'+-ve

e

-

-

-

-.

-_.

. . .

_

,

.

>

4

-

.

,

.

-

..

,.

0

/

r

~%

i

5

.

,

'

.

f

,

.

-

i

.

-

,

.

'

.

,

,

l

.

.,

4

l

Arkansas Power and Light Company

SEP 9

1974

l'

ANO-1

!

'

l

RO Inspection Report No. 50-313/74-11

cc w/encla

,

H. D. Thornburg, RO

{

RO:HQ (5)

t

DR Central Files

f

Regulatory Standards, (3)

j

Directorate of Licensing (13)

i

-

l

cc encl. only:

  • PDR

'NSIC

- * TIC, OR

  • State

f

I

.

1

  • To be dispatched at a later date

.

.

t

.

.

4

e

.

,,

.

!

-

.

9

  • ~>

,:

.

- ,- +, -

- ,

, , - - . - , ,

-,.

.e

, - - . ,~,, ,-~- -- - - - - , -, - . ,

--.-

- , - - ,

--,,--,----e--