Text
-
.
-
73
g#
%
t,NITEo STATES
p ""
i
C,
NUCLEAR REGULATORY COMMISSION
/
[ *I,
,
%
R EGloN IV
'~!
\\/
j
611 RY AN PLAZA oRIVE SulTE 1000
.
- 3 ITl
' s
ARLINGTON, TEXAS 76011
':,
$
. v.
s,
y
.....
November 12, 1976
Arkansas Power and Light Company
Docket Nos.
-
1
ATTN:
Mr. J. D. Phillips
68
Senior Vice President
Sixth and Pine Streets
Pine Bluff, Arkansas
71601
Gentlemen:
This refers to the inspection conducted by Mr. J. B. Baird of this
office during October 12-15, 1976, of activities authorized by NRC
Operating License No. DPR-51 and NRC Construction Permit No. CPPR-89,
and to the discussion of the inspection findings held by Mr. Baird with
Mr. J. H. Woodward and other staff members at the conclusion of the
inspection on October 15, 1976.
Areas examined during the inspection and our findings are discussed in
(p)
the enclosed inspection report. Within these areas, the inspection
L/
consisted of selective examination of procedures and representative
records, interviews with personnel, and observations by the inspector.
The inspector also examined actions you have taken with regard to
previously identified unresolved items. The status of these items is
identified in Section IV of the su= mary of the enclosed report.
Based on the results of this inspection, it appears that certain of your
activities were not conducted in full compliance with NRC requirements,
i
as set forth in the Notice of Violation, enclosed herewith as Enclosure 1.
This Notice is sent to you pursuant to the provisions of Section 2.201 of
the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations. Section 2.201 requires you to submit to this office within
twenty (20) days of your receipt of this notice, a written statement or
explanation in reply including:
(1) corrective steps which have been or
will be taken by you, and the results achieved; (2) corrective steps
which will be taken to avoid further violations; and (3) the date when
full compliance will be achieved.
In accordance with Section 2.790 of the NRC " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, 2 copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room.
If this report contains any information that you believe to be
,
8004110'h
-
.
-
.
-
.
-
-
,
( ,,/
Arka:aas Power and Light Company
-2-
November 12, 1976
proprietary, it is necessary that you make a written application within
20 days to this of fice to withhold such information from public disclosure.
Any such application must include a full statement of the reasons it is
claimed that the information is proprietary.
It should be prepared so
that proprietary information identified is contained in a saparate part
of the document, since the application, excluding this separate part,
will also be placed in the Public Document Room.
If we do not hear from
you in this regard within the specified period, the report will be placed
in the Public Document Room.
..-
Should you have any questions concerning this inspection, we will be
pleased to discuss them with you.
Sincerely,
a
S fGC04LJ
p
G. L. Madsen, Chief
Reactor Operations and
Nuclear Support Branch
A
Enclosures:
1.
!
2.
IE Inspection Report No. 50-313/76-14 and 50-368/76-13
.