ML19309D766
| ML19309D766 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 01/27/1977 |
| From: | Madsen G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | ARKANSAS POWER & LIGHT CO. |
| Shared Package | |
| ML19309D762 | List: |
| References | |
| NUDOCS 8004110656 | |
| Download: ML19309D766 (2) | |
See also: IR 05000313/1977002
Text
'
- .
._
,
,
.
.
.
_
L
UNITED STATES
0,,
NUCLEAR REGULATORY COMMISSIOf4
h
611 RYAN P
DRI E, SUITE 1000
2
ARLINGTON, TEXAS 76011
%,...../
January 27, 1977
Docket No. 50-313
IEFILE COPX
Arkansas Power and Light Company
ATTN: Mr. J. D. Phillips
Senior Vice President
Sixth and Pine Streets
Pine Bluff, Arkansas 71601
Gentlemen:
This refers to the inspection conducted by Messrs. M. W. Dickerson and
W. D. Johnson of this office on January 17-21, 1977, of activities
authorized by NRC Operating License No. DPR-51 for the Arkansas Nuclear
One, Unit 1 facility, and to the discussion of our findings held with
Mr. J. W. Anderson and other members of your staff at the conclusion
of the inspection.
(
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspectors.
During this inspection it was found that certain of your activities
were not conducted in full compliance with NRC requirements, as set
forth in the Notice of Violation, enclosed herewith as Enclosure (1).
This notice is sent to you pursuant to the provisions of Section 2.201
of the NRC's " Rules of PractNe," Part 2, Title 10, Code of Federal
Regulations. Section 2.201 requires you to submit to this office,
within 20 days of your receipt of this notice, a written statement or
explanation in reply including:
(1) corrective steps which been taken
by you, and the results achieved; (2) corrective steps which will be
taken to avoid further noncompliance; and (3) the date when full
compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public Document
Room.
If this report contains any information that you or your contractors
believe to be proprietary, it is necessary that you make a written
8004 M
.
.
_
_ _ _ _ _ - - _ - - _
_ _ _ _ _ _ _ _ - _ - -
,
_
'
. . -
-
-
~
.
.
..
.
~
.
O
Arkansas Power & Light Company
-2-
January 27, 1977
application within 20 days to this office to withhold such information
from public disclosure. Any such application must include a full
statement of the reasons why it is claimed that the infomation is
proprietary. The application should be prepared so that proprietary
information identified in the application is contained in a separate
part of the document.
If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document
Room.
Should you have any questions concerning this inspection we will be
pleased to discuss them with you.
Sincerely,
!
&
G. L. Madsen, Chief,
Reactor Operations and
Nuclear Support Branch
%
Enclosures:
1.
Appendix A - Notice of Violation
2.
IE Inspection Report No. 50-313/77-02
.
O
'
.
.
-
-
-
- - - - - -
, , .