ML19309D481
| ML19309D481 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 01/18/1980 |
| From: | Galen Smith NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Dunn C DUQUESNE LIGHT CO. |
| Shared Package | |
| ML19309D414 | List: |
| References | |
| NUDOCS 8004100373 | |
| Download: ML19309D481 (2) | |
See also: IR 05000334/1979026
Text
I
e
UNITED STATES
p gg
,
-
NUCLEAR REGULATORY COMMisslON
o
REGION l
3
g
$31 PARK AVENUE
d
f
KING OF PRUS$1 A PENNSYt.V AN4A 19406
yTcf4/
,
.....
Docket No. 50-334/79-26
JAtt i s M
Duquesne Light Company
ATTN: Mr. C. N. Dunn
Vice President
Operations Division
435 Sixth Avenue
Pittsburgh, Pennsylvania 15219
Gentlemen:
Subject:
Inspection No. 50-334/79-26
This refers to the inspection conducted by Mr. L. H. Thonus of this office on
November 26-29, 1979, at Beaver Valley Power Station, Unit 1, Shippingport,
Pennsylvania of activities authorized by NRC License No. DPR-66 and to the dis-
cussions of our findings held ny Mr. L. H. Thonus with Mr. J. Werling of your
staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, measurements made by the
inspector, and observations by the inspector.
Our inspector also verified the steps you have taken to correct the item of non-
compliance brought to your attention in a letter dated February 8,1979.
We
have no further questions regarding your action at this time.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full ccmpliance with NRC requirements, as set forth in the
Notice of Violation, enclosed herewith as Appendix A.
This item of noncompliance
has been categorized into the levels as described in our correspondence to you
dated December 31, 1974.
This notice is sent to you pursuant to the provisions
of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of
Federal Regulations.
Section 2.201 requires you to submit to this office,
within twenty (20) days of your receipt of this notice, a written statement or
explanation in reply including:
(1) corrective steps which have been taken by
you and the results achieved; (2) corrective steps which will be taken to avoid
further items of noncompliance; and (3) the date when full compliance will be
achieved.
The item, shown in the Notice of Violation enclosed with this letter, is a
recurrent or uncorrected item. An item of a similar nature was identified in
inspection number 50-334/78-32 conducted in November 1978.
In your response
please give this matter your particular attention.
l
8 004 7 00y3
L
..
,
,
.
Duquesne Light Company
2
,!As i g is
.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosures
will be placed in the NRC's Public Document Room.
If this report contains any
infonnation that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must be
accompanied by an affidavit executed by the owner of the information, which
identifies the document or part sought to be withheld, and which contains a
statement of reasons which addresses with specificity the items which will be
considered by the Commission as listed in subparagraph (b) (4) of Section 2.790.
The information sought to be withheld shall be incorporated as far as possible
into a separate part of the affidavit.
If we do not hear from you in this
regard within the specified period, the report will be placed in the Public
Document Room.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
-
,
.!!
l
i
e
j
<
.
w,b'
George H.fSmith, Chief
Fuel Facility and Materials Safety
Branch
.
Enclosures:
1.
Appendix A. Notice of Violation
2.
Office of Inspection and Enforcement
Inspection Report No. 50-334/79-26
cc w/ encl:
F. Bissert, Technical Assistant Nuclear
R. Washabaugh, QA Manager
J. Werling, Station Superintendent
G. Moore, General Superintendent, Power Stations Department
J. J. Carey, Nuclear Technical Assistant
R. Martin, Nuclear Engineer
l
l
I