Forwards IE Insp Repts 50-313/80-02 & 50-368/80-02 on 791222-800121 & Notice of Violation
ML19309D387
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 02/08/1980
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Cavanaugh W
ARKANSAS POWER & LIGHT CO.
Shared Package
ML19309D388 List:
References
NUDOCS 8004100315
Download: ML19309D387 (2)


See also: IR 05000313/1980002

Text

'[f* "%,%

l {L

UNITED STATES

.

y,c

g

NUCLEAR REGULATORY COMMISSION

s?

E

REGION IV

4 _ _.,

..; /

%, ' Vg/

o,

$11 RYAN PLAZA oRIVE, SUITE 1000

AR LINGToN, TEXAS 76012

+....

Docket No. 50-313/80-02

February 8, 1980

50-368/80-02

Arkansas Power and Light Company

ATTN:

Mr. William Cavanaugh III

Vice President of Generation

and Construction

P. O. Box 551

Little Rock, Arkansas

72203

Gentlemen:

This refers to the inspection conducted under the Resident Inspection

Program, by Mr. W. D. Johnson and Mr. L. J. Callan, of this office

covering the period of December 22, 1979 - January 21, 1980, of

activities authorized by NRC Facility Operating License No. DPR-51 and

NPF-6 of the Arkansas Nuclear One, Units 1 and 2, and to the discussion

of the findings by the inspectors with members of your staff at the

conclusion of each segment of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection con-

sisted of selective examination of procedures and representative records,

interviews with personnel, and observations by the inspectors.

During this inspection it was found that one of your activities was not con-

ducted in full compliance with NRC requirements, as set forth in the Notice

of Violation, enclosed herewith as Enclosure (1). This notice is sent to

you pursuant to the provisions of Section 2.201 of the NRC's " Rules of

Practice," Part 2, Title 10, Code of Federal. Regulations.

Section 2.201

requires you to submit to this office, within 20 days of your receipt of this

notice, a written statement or explanation in reply including:

(1) corrective

steps which will be taken by you, and the results achieved; (2) corrective

steps which will be taken to avoid further noncompliance; and (3) the date

when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

,

t

Room.

If the report contains any information that you believe tc be

l

l

8004100345-

L

--

!

.

.

Arkansas Power and Light Company

-2-

February 8, 1980

proprietary, it is necessary that you submit a written application to this

office within 20 days of the date of this letter, requesting that such

information be withheld from public disclosure.

This application must

include a full statement of the reasons why it is claimed that the

information is proprietary.

The application should be prepared so that any

proprietary information identified is contained in an enclosure to the

application, since the application without the enclosure will also be

placed in the Public Document Room.

If we do not hear from you in this

regard within the specified period, the report will be placed in the Public

Document Room.

Should you have any questions concerning this inspection, we will be

please to discuss them with you.

Sincerely,

A

G. L. Madsen, Chief

Reactor Operations and

Nuclear Support Branch

Enclosures:

1.

Notice of Violation

2.

IE Inspection Report Nos. 50-313/80-02

50-368/80-02

cc w/ enclosures:

Arkansas Nuclear One

ATTN:

J. P. O'Hanlon, General Manager

P. O. Box 608

Russellville, Arkansas

72801

l

!