ML19309D358

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 800121-23
ML19309D358
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 02/07/1980
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML19309D334 List:
References
50-344-80-02, 50-344-80-2, NUDOCS 8004100288
Download: ML19309D358 (1)


Text

..

APPENDIX A Portland General Electric Company 121 S. W. Salmon Street Portland, Oregon 97204 Docket No. 50-344 License No. NPF-1 NOTICE OF VIOLATION Based on the results of an NRC inspection conducted on January 21-23, 1980, it appears that one of your activities was not conducted in full compliance with NRC requirements as indicated below. This is a deficiency.

i Paragraph 5.a of Appendix A to 10 CFR 55 requires that records be l

maintained to document the participation of each licensed operator and senior operator in the requalification program.

Paragraph 7.1.7 of Trojan Training Procedure TP-2-2, which is the licensee's l

NRC-approved operator retraining program, requires that records of reactivity control manipulations be maintained.

r Contrary to these requirements, the licensee documented only one of the ten or more reactivity control manipulations performed by one-licensed senior operator during his two-year license term ending in October,1979.

/

b 8004100

_