ML19309C926
| ML19309C926 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 02/12/1980 |
| From: | Robert Carlson NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Andognini G BOSTON EDISON CO. |
| Shared Package | |
| ML19309C927 | List: |
| References | |
| NUDOCS 8004090395 | |
| Download: ML19309C926 (2) | |
See also: IR 05000293/1980003
Text
7%
p g,
UNITED STATES
o
NUCLEAR REGULATORY COMMisslON
,
g
REGION I
y
$
g
631 PARK AVENUE
- -
C
KING OF PRU554 A. PENNSYLVANIA 19404
- %,,,,*/
IEE 12 C1
Docket No. 50-293
Boston Edison Company M/C Nuclear
ATTH: Mr. G. Carl Andognini, Manager
Nuclear Operations Department
800 Boylston Street
Boston, Massachusetts
02199
Gentlemen:
Subject:
Inspection Report No. 50-293/80-03
This refers to the inspectbn conducted by Mr. G. Walton of this office
on January 22-24, 1980 at Pilgrim Nuclear Power Station, Plymouth,
Massachusetts of activities authorized by NRC License No. DPR-35 and to
the discussions of our findings held by Mr. G. Walton with Mr. R. Machon
of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of
Inspection and Enforcement Inspection Report which is enclosed with this
letter. Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were
observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2. Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room.
If this report contains any information that you (or your contractor)
believe to be proprietary, it is necessary that you make a written
application within 20 days to this office to withhold such infonnation
from public disclosure. Any such application must be accompanied by an
affidavit executed by the owner of the information, which identifies the
document or part sought to be withheld, and which contains a statement
of reasons which addresses with specificity the items which will be
considered by the Comission as listed in subparagraph (b) (4) of Section
2.790. The information sought to be withheld shall be incorporated as
far as possible into a separate part of the affidavit.
If we do not
i
hear from you in this regard within the specified period, the report
will be placed in the Public Document Room.
,
l
I
8004090 3
i
-
.
.
Boston Edison Company M/C Nuclear
2
No reply to this letter is required; however, should you have any questions
concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
f.
=
Robert T. Carlson, Chief
Reactor Construction and Engineering
Support Branch
Enclosure:
Office of Inspection and Enforcement Inspection
Report Number 50-293/80-03
a
cc w/ encl:
P. J. McGuire, Pilgrim Station Manager
-
,
l
l
l
t
-i
!
.
._.
-
.
-