Forwards IE Insp Rept 50-293/80-03 on 800122-24.No Noncompliance Noted
ML19309C926
Person / Time
Site: Pilgrim
Issue date: 02/12/1980
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Andognini G
BOSTON EDISON CO.
Shared Package
ML19309C927 List:
References
NUDOCS 8004090395
Download: ML19309C926 (2)


See also: IR 05000293/1980003

Text

7%

p g,

UNITED STATES

o

NUCLEAR REGULATORY COMMisslON

,

g

REGION I

y

$

g

631 PARK AVENUE

  • -

C

KING OF PRU554 A. PENNSYLVANIA 19404

  • %,,,,*/

IEE 12 C1

Docket No. 50-293

Boston Edison Company M/C Nuclear

ATTH: Mr. G. Carl Andognini, Manager

Nuclear Operations Department

800 Boylston Street

Boston, Massachusetts

02199

Gentlemen:

Subject:

Inspection Report No. 50-293/80-03

This refers to the inspectbn conducted by Mr. G. Walton of this office

on January 22-24, 1980 at Pilgrim Nuclear Power Station, Plymouth,

Massachusetts of activities authorized by NRC License No. DPR-35 and to

the discussions of our findings held by Mr. G. Walton with Mr. R. Machon

of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of

Inspection and Enforcement Inspection Report which is enclosed with this

letter. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2. Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room.

If this report contains any information that you (or your contractor)

believe to be proprietary, it is necessary that you make a written

application within 20 days to this office to withhold such infonnation

from public disclosure. Any such application must be accompanied by an

affidavit executed by the owner of the information, which identifies the

document or part sought to be withheld, and which contains a statement

of reasons which addresses with specificity the items which will be

considered by the Comission as listed in subparagraph (b) (4) of Section

2.790. The information sought to be withheld shall be incorporated as

far as possible into a separate part of the affidavit.

If we do not

i

hear from you in this regard within the specified period, the report

will be placed in the Public Document Room.

,

l

I

8004090 3

i

-

.

.

Boston Edison Company M/C Nuclear

2

No reply to this letter is required; however, should you have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

f.

=

Robert T. Carlson, Chief

Reactor Construction and Engineering

Support Branch

Enclosure:

Office of Inspection and Enforcement Inspection

Report Number 50-293/80-03