APPENDIX A NOTICE OF VIOLATION Alabama Power Company License No. NPF-2 Farley.

Based on the NRC inspection December 10-14, 1979, certain of your activities were apparently not. conducted in full compliance with NRC requirements as indi-cated below. These items have been categorized as described in correspondence to you dated December 31, 1974.

4 As required by Technical Specification 6.8.1, written procedures shall be i

established, implemented and maintained. Plant Procedure FNP-1-AP-52, Equipment Status Control and Maintenance Authorization, states that the releasing individual will review item 12 through 20 on the work request and will sign the " release for work" section only if the request is complete and accurate.

Contrary to the above, FNP Work Request 19749, which called for the repair of waste gas tank no. 6 inlet isolation valve (QIG-22V085B), in accordance with Plant Procedure FNP-0-MP-21.1, was released for work although the

?

plant conditions necessary for performing the work were not Established.

The Tagging Operations Order (No. 79-1671) referenced on the work request did not establish the plant conditions necessary to perform the work specified on the work request.

This is an Infraction.