ML19309C011

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-348/79-42 on 791210-14 & Notice of Violation
ML19309C011
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 02/04/1980
From: Stohr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Clayton F
ALABAMA POWER CO.
Shared Package
ML19309C001 List:
References
NUDOCS 8004080034
Download: ML19309C011 (2)


See also: IR 05000348/1979042

Text

'

.

.

s

fl

o

UNITED STATES

V!

NUCLEAR REGULATORY COMMISSION

o

a

REGION 11

101 MARIETTA ST., N.W., SUITE 3100

o

ATLANTA, GEORGIA 30303

.....

In Reply Refer To:

FEB 041K0

RII:CMH

50-348/79-42

Alabama-Power Company

ATTN:

F. L. Clayton, Jr.

Senior Vice President

P. O. Box 2641

Birmingham, AL 35291

Gentlemen:

This refers to the inspection conducted by C. M. Hosey of this office on

December 10-14, 1979, of activities authorized by NRC License NPF-2 for the Farley

facility, and to the discussion of our findings held with W. G. Hairston, III at

the conclusion of the inspection.

,

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements. This item and references

,

to pertinent requirements are listed in the Notice of Violation enclosed here-

with as Appendix A. -This notice is sent to you pursuant to the provisions of

Section 2.201 of. the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Section 2.201 requires you to submit to this office, within 20

days of your receipt of this notice, a written statement or explanation in reply

.

including:

(1) corrective steps which have been taken by you and the results

achieved; (2) corrective steps which will be taken to avoid further noncom-

pliance; and (3) the date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. ,Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard within

l

the specified period, the report will be placed in the Public Document R'oom.

i

I

8004060 0

.

-

. - . - - .

-

. - - .

FEB 0 4 1980

..

,

..

Altbtma P:w r Compray

-2-

- .

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

!

-

.

M

'

J Phi ip St hr, C ief

uel Facility and Materials

Safety Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-348/79-42

cc w/ encl:

A. R. Barton

Executive Vice President

P. O. Box 2641

Birmingham, AL 35291

,

J. T. Young

Vice President-Production

Post Office Box 2614

.

Birmingham, Alabama 35291

-

H. O. Thrash

Manager-Nuclear Generation

P. O. Box 2641

Birmingham, AL 35291

C. Biddinger, Jr.

g

Manager-Corporate Quality Assurance

P. O. Box 2641

Birmingham, AL 35291

'

W. G. Hairston, III

Plant Manager

Drawer 470

. Ashford, AL 36312

R. E. Hollands, Jr.

QA Supervisor

. P. O. Box U

Ashford, AL 36312

,

9

i

'

.

.

-

+'--k

e

.*

saee-

p.*e.,v,.,

,9y,

.

,,p

yNe ps

h 6 ,-

d a A.v

    • T

-

M