ML19309B590
| ML19309B590 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 02/08/1980 |
| From: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Andognini G BOSTON EDISON CO. |
| Shared Package | |
| ML19309B591 | List: |
| References | |
| NUDOCS 8004040407 | |
| Download: ML19309B590 (1) | |
See also: IR 05000293/1980001
Text
T%
e
.
p ggy
UNITED STATES
p
o
NUCLEAR REGULATORY CoMMisslON
[
R EGION I
o
$
$
$31 PARK AVENUE
C
KING OF PRUSSI A. PENNSYLV ANI A 19406
s .*** /
FEB
8 1980
+
Docket No. 50-293
Boston Edison Company M/C Nuclear
ATTN:
Mr. G. Carl Andognini, Manager
Nuclear Operations Department
800 Boylston Street
Boston, Massachusetts 02199
Gentlemen:
Subject:
Inspection Report 50-293/80-01
This refers to the inspection conducted by Mr. D. Kehoe of this office
on January 8-11, 1980 at Pilgrim Nuclear Power Station, Unit 1, Plvmouth,
Massachusetts of activities authorized by NRC License No. DPR-35 and to
the discussions of our findings held by Mr. Kehoe with Mr. P. McGuire of
your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of
Inspection and Enforcement Inspection Report which is enclosed with this
letter. Within these areas, the inspection consisted of selective
examinations of procedures and representative records, inteniews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance werrc
observed.
In accordance with Section 2.790 of tha NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room.
If this report contains any information that you (or your contractor)
believe to be proprietary, it is necessary that you make a written
application within 20 days to this office to withhold such information
from public disclosure. Any such application must be accompanied by an
affidavit executed by the owner of the infonnation, which identifies the
document or part sought to be withheld, and which contains a statement
of reasons which addresses with specificity the items which will be
,
considered by the Comission as listed in subparagraph (b) (4) of Section
2.790. The information sought to be withheld shall be incorporated as
far as possible into a separate part of the affidavit.
If we do not
hear " rom you in this regard within the specified period, the report
will De placed in the Public Document Room.
e
8004040+07
'
- - -
-
.
.
.
FEB
8 1980
Boston Edison Company M/C Nuclear
2
No reply to this letter is required; however, if you should have any
questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
O
- ._
-
s'
1
n' . Brunner, Chief
R ctQr Operations and Nuclear
S pport Branch
Enclosure:
Office of Inspection and Enforcement Inspection
3eport Number 50-293/80-01
i
)
cc w/ encl-
P. J. McGuire, Pilgrim Station Manager
I
. _ .