f SP 206.03B DIESEL GENERATOR B SYNCHRONIZATION SURVEILLANCE TEST 1.0 PURPOSE

.1 To monthly start the "B" Diesel Generator from the control room.

.2 To monthly assure the "B" Diesel Generator can be synchronized to the 43 bus.

.3 To monitor operation of the Diesel Fuel Oil Pumps P-888C and P-888D monthly.

,.4 To log the quantity of diesel fuel oil in Diesel Fuel Oil Storage Tank T-887B monthly.

2.0 REFERENCES

.1 Rancho Seco Unit One Operating Procedure A.31, " Diesel Generator System".

.2 Rancho Seco Unit One Technical Specifications, Sections 3.7 and 4.6.

.3 Rancho Seco Unit One AP 206.03.

.4 Rancho Seco Unit One AP 213.

.5 In-Service Testing of Pumps in Nuclear Power Plants, Subsection IRP of Section XI ASNE Boiler and Pressute Vessel Code, Summer,1973.

.6

. Rancho Seco Unit One Operating Procedure A.32, " Diesel Fuel Oil System".

.7 AP.33, Calibration and Control of Measuring and Test Equipment.

l6 3.0 LIMITS AND. PRECAUTIONS

.1 All 1.imits and precautions listed in OP A.31.

.2 Test only one diesel-generator at a time.

.3 The diesel generator should NOT be synchronized with the " NORMAL-DROOP" switch in "NORMAI.".

.4 Loads belou 700 CJ should be minimized.

SP 206.03B-1 Rev. 6 d[d b

f I

3.0 LIMITS AND. PRECAUTIONS (Continued)

.5 If-test equipment, other than installed instrumentation, is used the serial number and recalibration due date must be documented 6

in the appropriate space on Enclosure 1, 6.1 Data Sheet.

4.0 SURVEILLANCE TEST PROCEDURE

.1 Monitor Operation of P-888C and 888D.

.1 Diesel Fuel Oil System is aligned per A.32, Section 5.0, normal Operation. Place the " Auto-Off-Hand" control switch of P-888D in "0FF".

.2 Place the " Auto-Off-Hand" control of P-888C in " HAND".

.3 Observe from LG-89308 that the Diesel Generator Fuel Oil Day Tank is full.

.4 After 15 minutes, record the discharge pressure for P-888C from PI-88803 and the running current at 2B114.

.5 Place the " Auto-Off-Hand" control switch of P-888D in "0FF".

.6 Place the " Auto-Off-Hand" control switch of P-888D in " HAND".

.7 After 15 minutes record the discharge pressure of P-888D from PI-88804 and and the running current at 2B115.

.8 Record the pressure differential across strainers Y-88811 and Y-88812 from PDI-88814.

.9 Place the " Auto-Off-Hand" control switch of P-888C and P-888D in "AUT0".

.10 Diesel Generator Fuel Oil System is now in the standby mode.

.2 Starting and synchronizing the "B" Diesel-Generator.

.1 Record the beginning elapsed running time of the "B" Diesel-Generator.

.la Check the crankcase oil level (the oil icyc1 should be at or above the FULL cark).

.lb Check engine coolant level (level should'be in the surge tank gage glass within the appropriate marks).

.2 Verify the "B" Diesel-Generator is in standby in accordance with 4.1 of OP A.31.

SP 206.033-2 Rev. 6

~

'4.0 SUR'TEILLANCE TEST PROCEDURE. (Continued)

.3 Start the "B" Diesel-Generator in accordance with 4 2 f 0P 60

'A.31.

Verify the Diesel starts, voltage is 4160 -o volts andthat-frequencyis38+3 HZ. ' Record data in Enclosure 6.1.2.2.

.4 Synchronize and load the "B" Diesel-Generator to at least 1000 KW in accordance with 4.2 of OP A.31.

.5 Observe operation of diesel auxilaries (soak back and bypass oil pumps, air compressors cut-in and cut-out and~ starting-motors).

Record any abnormalities in 6.1.1.5,

.Sa Verify that both supply and exhaust fans started by checking breakers 52-3B06 and 52-3B17 closed.

.6 Allow the engine paraneters to stabilize for an hour and record generator and diesel data in Enclosure 6.1.2.3.

.7 Observe the level in the Diesel Generator Fuel Oil Day Tank T-893B. Record the level.

.8 Remove the diesel generator load from the bus and shut down as specified'in OP A.31, Section 6.1.

7

.9 Record ending elased time.

.3 Monitor Quanity of Diesel Fuel Oil Storage Tank T-887B.

.1 Record the level and quantity of diesel fuel oil in Tank 8873 fron LI-88702.

5.0 ACCEPTANCE CRITERIA

.1 Diesel Generator "B" shall start from the control roon and accel-erate to rated frequency and voltage.

.2 Diesel Generator "B" shall successfully be synchronized to the 48 bus.

.3 Diesel auxiliaries and fuel oil transfer pumps operate.

.4 Diesel Fuel 011 shall be greater than 35,000 gallons.

7 6.0 ENCLOSURES

.1 Data Sheet.

uSP 206.033-3 Rev. 7-

e

(-

ENCLOSURE ~1 SP 206.03B

' DIESEL GENERATOR "B" SYNCHRONIZATION SURVEILLANCE TEST 6.1 DATA SHEET ~

-Date Tested Date Test Due Tested By

.l.

Check List:

INITIALS

.1 Section 4.0. of SP 206.03 completed.

.2 Diesel Generator'"B" returned to standby status per A.31.

.3 Diesel Fuel Oil System "B" returned to standby status per A.32.

.4 List all test equipment serial numbers and calibration dates.

5

.5 Remarks:

.2 Data:

.1 Beginning engine elapsed time

.2 Diesel Generator "B" started from Control Room.

Yes/No Frequency HZ Voltage Field Amps Field Volts

.3 Diesel Generator "B" synchronized to "4B" bus.

YES/NO-

.3a-52-3B06 closed YES/No. 52-3B17 closed YES/NO. c Diesel Engine Data:

"A" Starting Air Press.

psi "B" S tarting Air ' Press.

psi F.O. Inlet Press.

psi F.O. Manifold Press.

psi Crankcase Press.

in H O Intake Air Vacuum in H O 2

2 L.O.. Press.

psi Fuel Oil Filter DP psi L.O. Inlet Temp.

  • F

'L.O. Outlet Temp.

-F

. Jacket Water Inlet Temp.

  • F Jacket Water Outlet Temp.
  • F q

Manifold ~ Air Intake Temp.

  • F Turbo Exht. Inlet Temp.
  • F.

Turbo - Exh t. Outlet Temp.

  • F Oil Cooler / Water Outlet Temp.
  • F Engine R.P.M.

RPM.

L.O. Filter DP psi

' Jacket Water Flow gp=,

5-SP 206.033-4, Rev.

.s

. i =.==:

>==

y

_.3 - -

ENCLOSURE 1

.6.1 DATA SHFET (Continued)

INITIALS Engine Exhaust Temp. *F Cylinder Head Temp. 'F 1

2 3

4 1

2-3 4

5 6

7 8

5 6~

7 3

9 10 11 12 9

10 11 12 13 14 15 16 13 14 15 16 17 18_.

19 20 17 18 19 20 Engine Bearing Temperature 1

2 3

4 5

6 7

8 Generator Load Data:

Kilowatts KiloVARS Amps Volts Frequency RPM Field Amps Field Volts Stator Temp.

1 2

3 4

Gen. Bearing Te.mp.

1 2

3 4

Cenerator Main Bearing Vibration Test Equipment S/N Date Axial Vertical Horizontal Displacement (mils)

Velocity (in/sec)

Diesel Room Temp.

.4 Diesel Generator "B" Fuel Oil' Day Tank Level

, FULL J

l7 l

.4b Engine Coolant Level in accordance with Section 4.1.lb YES/NO

.5 Ending engine elapsed rime

.6 Strainers differential pressure from PDI-88814 psid

.7 Diesel Fuel Oil Quantity and level from LI-88702.

l Gallons Inches

.3 Diesel Fuel Oil Pumps Data

.1 P-888C Discharge pressure psig at PI-88803.

.2 P-888C Running' current at 2Bil4 amps.

.3 P-888D. Discharge Pressure' psig at PI-88804.

.4' P-888D Running Current at:2B115 amps.

.5 Remarks (Visual, Audio, and Control Room Examination)

SP 206.033-5 Rev. 7

-s

(

ENCLOSURE 1 6.1 DATA = SHEET (Continued)

INITIALS

.4 Calculations Completed by Plant Engineer.

.1

' P-888C Differential Test Pressure D.T.P. = Discharge press. from 6.1.3.1 + (143-level from 6.1.2.7/33.

+ (143-

') /33.

=

psi.

/

=

.2 P-838D Differential Test Pressure D.T.P. = Discharge press. from 6.1.3.3 + (143-level from 6.1.2.7) /33.

+ (143-

) /33.

=

pui.

=

.3

" Maximum exhaust temperature difference between two cylinders

." Desired:

< 150*F

/

1

.4

" Maximum head temperature difference between two cylinders

." Desired: < 75'F

/

.5 Test results acceptable?

YES/NO Remarks - Action Taken:

I

/

-SP 206.03B-6, Rev.'l:

+

. /.,

EM-126-A!CiUAL TESTING AND MADITEMA';CE OF -DIESEL GENEP.ATORS -

CDi. rio.

2 DATE 1.0 PUPJOSE

.1 To check Hydraulic Governor for correct operation.

.2 To check Electric Governor for correct operation.

.3 To check Electric Governor Control Motor Limit Switches.

.4' To check manual voltage Control Motor Limit Switches.

.5 To check automatic voltage Centrol Motor Limit Switches.

.6 To observe Speed Switch for.orrect function.

.7 Check mechanical overspeed trip.

2.0 REFERENCES

.1 Control System Description of Emergency Diesel Generators.

.2 Bechtel Drawing SK-f 292-E87, Sheet 1 thru 4.

.3 Bruce b.M. Diesc1 Operating and Instruction !!anuals.

3.0 LTIIIT!sTIONS A';D PRECN;TIONS

.1 Precautions normal ts 4 KV equipment.

.2 Precautions noted in the Operating and Instruction. Manuals for.

' the Engine, Generator and Excitation System.

NOTE

-)

All personnel directly involved with this test i

shall be thoroughly fa:iliar wtih the pertinent drawings and instruction manuals, and the means -

for emergency canual shutdown of the engine.

.3 During the course of the_ tests, nonitor all diesel engine tenperature, pressure and level indicators to insure that equipoent is operating satisfactorily. Refer to POM.A31 for pressure and icvel guidelines.

Th 0

)

I D i

Eli-126/1 Rev. 2 gg g!

O.9 I l

g s

du 1

0 9

~.

' LIMI.TNI10NS AND PRECAUTIO3S ' (Continued) 3.0

.4 Do not allow the spe,ed of the engine to exceed 1080 RPM.

.5 Do not allow the machine to operate below h0% of normal speed at any extended periods of time with the excitation system turned on.

.6 Assi n one man to stand by the manual fuel shut-off lever to E

initiate a manual shutdev.a, if required.

.7 Because of the high noise level, car protection equipment cust

~be worn.

.8-The generator field. exciter, and voltage r'egulator circuits are: isolated from ground.

Rubber gloves are recommended if working on these circuits with the cachine in operation.

4.0 SPECIAL TOOLS / EQUIP!'ENT

.1 Strobotac.

5.0 TESTING / ACCEPTANCE CRITERIA

.1 Instrebent calibrction on th$ folicwing to within i 2%.

DATE OF CALIBRATIC",

INITIAL e

.1 RPM Meter

.2 AC Voltceter 2

.3 Frequency Meter

.4 AC Amteter

.5 DC Voltmeter

.6 DC Anecter

.2 Measured values within : procedure, Steps 6.0.5

.6

.9

.13

.14 -

.17

.20

.22

.24

.25

.26

.27

.28

,30

.31

.33 -

.37

.39 are v.i hin specifications given in procedure step.

t D

< em

,l D

}p wT y VE-

_l

._ 3 EM.126/2' Rev. 2 l

l

.j

_6.0 PROCEDUld.

INITIAL NOTE m.

Operations to align systen as-per / Section4, prior to, runn...g test.

.1 Open DC control Breaker and DC Field Breaker.

.2 Recove, cover from relay RC3.

.3 Close DC Control Breaker.

.4 Put Local /Rc=cte Switch in Local Position.

s

.5 Start diesel using Idle Start Button:. verify air motors disengage at 200 PJM i 40 RPM PJM, and engine speed stabilizers at 600 PEM i 60 RPM RPM.,

2

.6 Push Loca'l Idle release button and verify that engine speed increases to 940 RPM I 20 RPM ' ' ' RPM.

.7 Open fuses to air motors FU3 and FU5 see print SK-6292-E-87, Sheet 1.

.8 Have an assistant physical'ly prevent the overspeed o

licit. swicch from operating by holding it in the normal operating position.

.9 Byce$nsofthemanualcontrolleverincreasethe RPM of the engine until the overspeed trip mechanism 2

shuts down the engine.

"his should be 1040 RPM 26, RPM ~

PJM.

. i. i ~

(WARNING - DO NOT EXCEED 1080 RPM)

.10 When RPM is at zero have the assistant release the overspeed trip limit switch.

.11 Observe that the SDR relay picks up and the emergency shutdown blue light is lit.

.12 Replace fuses FU3 and FU5.

.13 Close DC Field Bieaker; push Maintenance Start 2

- Button and verify that speed st'aoilzes at 900 RPM; Frequency is 60 hertz 0.5 hertz; Voltage is 4160-

~

' volts t 40 Volts.

D D l VUI D!-126/3 Reir. 2 e

~

I f

6

,e

,a. g ;y

'a'. '6.0-

. PROCEDUR 'g.,cntinuc'd)

~

^

a T J. '

.14 " Push'VoltageIShutdown Button and: verify that f'~

voltage, current.and' frequency rrturn-to--Zero and

' RPM increases to' 940,RP:t 1 20. RPM.

RPM.:

~

'2:

4

.15L Push Recote Emergency Shutdown. Button.and verify.

tha t. diesel engine. shuts.- down. -

.'16 Verify Voltage Regulator Handle.is in AUTO position.

4

..17

  • Push Naintenance ' Start Button and verify that _ engine-1-

speed stabilizes at 900 RPM; Voltage is 4160 Volts 40 Volts; Frequency is 60 hertz 1 0.5 hertz 2

~

hz and Field Flashes at 400 RPM i 20 RPM RPM.

A' just Manual Voltage control Switch until Blue

.1' d

l; light comes on.

I~

.19 Switch Volt-Regulator Switch from AUTO to Manual voltage 'should not change i 208v.

4,

.20 Raise MVC. Switch until~ Linit Switch (S1) opens; i

this opens at 4800-5000 Volts or 163 Tield AMPS l

whichever is lower

. Volts / AMPS.

.21 Lower MVC Suitch until motor stops; this should be about 5 degrees before mechanical stop is reached.

4 2

{

.22 Adjust MVC Switch until 3LUE light comes on at i

4200 Volts i.40 '

Volts.

2

~

4-

.23

- Turn Volt-Regulator Switch to AUTO.

I

.24 Verify voltage is 4200 Volts i:40 Volts.

I

.25 Lower AVA C,antrol Switch until lower linic Switch

[

(S2) ope'ns;. 'crify voltage is 3750. Volts i 40 -

Volts.

.26

)!anually pick-up. Relay RC3 and verify voltage returns "to.4160 Volts + 40 Volts.

2- _

..27 Raise AVA Control Switch until Upper Limit.Suitch (S1) opens; verify voltage 4600~ to 4700 Volts or

163 DC Amps uhichever is lower Volts / AMPS.

.28 - Manually pick up Relay RC3 and verify voltage returns.,

to 4160-Volts i 140 Volts.

.29 ' Place the Elcetric-Covernor Speed-Droop Switch in the

-NOR21AL position.

tI u__

1 2 nt-126/4. Rev. : 2.

11. ll

. T

.k

. 9

.y 2

m

.a

~

.'6.0

_ PROCCD d ] Continued)

.30 Lower the Electric Covernor Switch until the Control Motor stops; verify RPM is; 660 F2M i 10 RPM RPH.

2

.31 Manually pfek up Reicy RC3 and verify that the speed of the engine returns to 900 RPl!

RPM.

.32 Raise the Electric Covernor Switch unti1~ the Upper Limit, Switch stops the motor.

NOTE The Hydraulic Governor should hold the speed belov 950 RPM.

2

.33 Manually. pick up and hold Reicy RC3 and verify that the engine speed lowers er 910 RPM i 10 RP:t RPM.

.34 Place the Electric Droop Suitch in the DROOP, position.

.35 Place the Local / Remote Switch in the remote position.

~

.36 Have the Control Roon Operator synchroni c the Generator to the power systen and adjust the Generator load to 2750131 and 2060 KVAR overexcited and run' for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

.37 Have the Control Roon Operator raise the Generator load until electric Governor Control Upper Limit Switch i

opens at 2800-2850 131 IGT.

]

.38 Have the Control Room Operator reduce the load on the Generator and shut the unit down using the Rc=ote Normal Shutdown Button.

l

.39

, Verify that. diesel takes approximately 15 min. t 2

shut dcun i 2 clin.

i

.40 Release diesel to Shift' Supervisor.

i PROCEDUP2.EEVIEWED BY DATE

\\

7.0 ENCLOSURES 0hhM

~

.1

-None dj $ j<

I k &D

@ L & J}L l

p A.4

'EM-126/5 Rev. 2