Responds to AEC Re Violations Noted in Insp Rept 50-312/72-06.Corrective Actions:Procedures for Radiographic Examination of Primary Piping Reviewed & Approved & Const Practices Re Portable Electrode Warmers Implemented
ML19309A195
Person / Time
Site: Rancho Seco
Issue date: 03/05/1973
From: Mattimoe J
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Rich Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML19309A189 List:
References
NUDOCS 8003260902
Download: ML19309A195 (2)


Text

-

%)

3

' w:

3Y) t Q'LE SACRAMENTO MUNICIPAL UTILITY. DISTR CT O 6201 S Street, Box 15830, Sacramenta. California 95813; (916) 452-3211 March 5, 1973 Mr. R. W. Smith Directorate of Regulatory Operations' Region V U. S. Atomic Energy Commission 2111 Bancrof t Way Berkeley, California 94704 Rancho Seco Nuclear ~ Cenerating Station, Unit No. 1 AEC Audit of December 18 - 21, 1972 Docket No. 050-0312

Dear Mr. Smith:

In response to your letter identifying three areas of non-compliance with our quality assurance program, please be advised of j

the following actions which have been taken:

1.

Regarding appr' oval of procedures for radiographic examination of primary piping, these procedures have been reviewed and j

approved.

2.

Regarding the proper storage of weld rod, including E7018 and E90 type rods, the following actions have been taken:

t a.

The construction practices relating to the use of portable I

electrode warmers has been implemented with "a revision to Quality Control Instruction No. 301; namely, "On site storage of welding filler metal shall be under conditions as outlined in the AWS Specification applicable to the filler metal as purchased and/or the Bechtel Welding Standards." If the requirements provided in the Bechtel Welding Standards differ from those in the AWS Specifi-cations, the Bechtel Welding Standard shall take precedence.

Where other than normal storage temperatures are to be maintained 'in the portable rod warmers, this information shall be provided on the WR-6 form.

- T A Field Directive dated February 12, 1973 has been issued

$'Miljs4 /^')

to all concerned field personnel to take cognizance of the

' ;} ~ T. h y..

importance of controlling the covered electrodes issued in V-the portable rod warmers. A copy of this directive has been

,.g'}),,",-C3 jQ.e)e..postedatalltheroddispersalrooms.

u..;

e o.<y-

.a n

8003 260 iC2-y

d

<m 4

s..

Mr. R. W.-Smith March 5, 1973 If there are any questions on the corrective measures taken, please advise.

i 4

Sincerely yours,

/

I. *. hjat. {

4 i

'J.'J. Mattimoe i

Assistant General Manager I

and Chief Engineer j

~J l

i 4

1 I

g.,

i

~

i 4

e6 t

e a

I

[

P I

i i

e i

.5 4

'9

. t '-

k

+

4 u.

1.

.2

. _ -. -... _.. _ _ _ _ _ _ _ _ _.. _ _ _. _.. _ _ _ _ _. _.. - _ _ _.. _., _.. _ _....... _. _ _ _ _ _ _ _. _ _.. _..... _ _. _