Amend 5 to Application for CP & Ol,Updating General Financial & Statistical Info.Analysis of PSAR Changes Encl. Withdraws Application for Unit 4
ML19308E271
Person / Time
Site: Crystal River, 05000303  Duke Energy icon.png
Issue date: 04/01/1968
From:
FLORIDA POWER CORP.
To:
Shared Package
ML19308E260 List:
References
NUDOCS 8003240819
Download: ML19308E271 (7)


Text

q q

D 9

BEFORE THE DOCl(ETED UNITED STATES USAEC ATOMIC ENERGY COMMISSION 1%By 40

~

jdK3 AMENDMENT NO. 5 unum y a nut nruA [

Il TO 4

W I' 4 " '

d'

/b APPLICATION BY FLORIDA POWER CORPORATION FOR A SECTION 104b CONSTRUCTION PERMIT AND LICENSE FOR A UTILIZATION FACILITY g.;,,, e... - CN C.

DOCKET NOS. 50-302 & 50-303 Florida Power Corporation, a corporation organized and existing under the laws of the State of Florida, applicant for an operat-ing license and construction permit for Crystal River Units 3

& 4 Nuclear Generating Plant, hereby amends, by attached pages, its Application to delete references to Unit 4 from the Volume titled " Application for Licenses" and to delete technical refer-ences to Unit 4 from the Preliminary Safety Analysis Report Vol-umes as the decision has been made by the Applicant that Unit 4 will not be constructed and is withdrawn from the application per our letter to the Atomic Energy Commission dated March 25, 1968.

Amendment 5 includes, as a separate packet, revised pages for the Application for Licenses Volume to update this volume with the latest General, Financial and Statistical Information, and Technical Qualifications of the Applicant.

The plant design criteria for Unit 3 remain unchanged because of the deletion of Unit 4.

To assist in the comparison of the present single unit plant with the original two unit concept we offer a section by section analysis of the Amendment 5 changes to the Preliminary Safety Analysis Report.

Section 1 -

Page changes reflect the deletion of the third diesel generator unit for emergency power supply leaving two for Unit 3.

Figures 1-3 thru l-ll have been revised to show the effects on the plant layout due to the removal of Unit 4.

We have purposely left these figures to the same scale, while showing Unit 3 only for ease of comparison.

Figure 1-12 has been revised to show a more direct line of responsibility from the Construction Manage-ment and its Quality Assurance Forces to the Nuclear Project Manager.

9 8003 240 6 l/

O O

Amendment No. S' Page 2 Sections 2 and 3 -

There are no technical revisions required in Sections 2 and 3.

Section 4 -

Change to 4.4.3 reflects the elimination of Unit 4 from the Material Irradiation Surveil-lance Program.

Sections 5, 6, and 7 -

There are no technical revisions required in Sections 5, 6, and 7.

Section 8 -

This section is revised to reflect the changes in:

Plant Distribution System Auxiliary Transformers 4160 Volt Auxiliary Systems 480 Volt Auxiliary Systems Auxiliary Power Sources On Site Emergency Power Table 8 Engineered Safeguard Busses i

Connected Safeguard Loads-Figure 8 Single Line Diagram Section 9 -

General revision of Section 9 reflects the changes in Auxiliary Equipment due to the single unit concept and the elimination of shared equipment while still maintaining necessary redundancy in the emergency systems.

Section 10 -

There are no technical revisions required in Section 10.

Section 11 -

Basic change is to eliminate Unit 4 equipment and releases from the write-up. As each was listed generally on a per unit basis there is no change in so far as Unit 3 is concerned.

l

a m

Amendment No. 5 Page 3 Section 12 -

There is no technical change in Section 12 but we have taken this opportunity to reaffirm and clarify the plant organization personnel.

Section 13 -

There are no technical revisions required in Section 13.

Section 14 -

Paragraph 14.2.2.3.4 - Accident Analysis has been revised to reflect the changes in emer-gency power systems. The presented analysis in this Amendment is identical to that of Met-Ed Three Mile Island Plant in its appli-cation to Crystal River Unit 3.

Supplement #1 - Question 1.2, Page 2, changes reflect the change in number of Emergency Diesel Generating units from 3 to 2.

You will note that we have not furnished revised pages to com-pletely reflect the removal of all references to Unit 4.

We respectfully request that any non-technical references to Unit 4 which remain after insertion of Amendment 5 be ignored and/or no longer considered. These are located primarily on title blocka for curves and figures in the Preliminary Safety Analysis Report.

j This amendment to the application contsins no restricted data or other defense information.

.O Q

Ameridment No. 5 Page 4 IN WITNESS WHEREOF, the applicant has caused its name to be hereunto signed by J. T. Rodgers, Nuclear Project Manager, and its corporate seal to be hereunto affixed by J. G. Loader, Secretary, thereunto duly authorized this 1st day of April, 1968.

FLORIDA POWER CORPORATION By

'!-t' i ul

. r J.' T. Rodgers,'

Nuclear Project Manager ATTEST:

L d

te cjkL.

'J. G. Loader Secretary (CORPORATE SEAL)

Sworn to and subscribed before me this 1st day of April, 1968.

g1.r_a,)41~%

1-

_v Notary Public My Commission Expires:

Notary Public State of Florida at Large.

My Commission Empires July 9,1970 (NOTARIAL SEAL) l

A A

Dockets 50-302 and 50-303 April 8, 1968 r

g J st.-eLut42-*

[M ' 9 AMENDMENT NO. 5

, -t'

/

ia 6

FLORIDA POWER CORPORATION

.#~

Crystal River Plant Units 3 & 4 Amendment No. 5 to the Florida Power Corporat1w's Application for Licenses contains revised pages to update the volume titled " Application for Licenses" with the la. test General, Financial and Statistical information, and Technical Qualifications.

Amendment No. 5 also deletes financial and technical references to Crystal River Unit 4.

Revised pages of Amendment No. 5 for the Preliminary Safety Analysis Report portion of the Application are submitted as a separate package.

The following sheets and exhibits of the Application for Licenses Volume are to be deleted and, where appropriate, revised sheets dated 3-29-68 and 4-8-68 should be inserted.

Remove the following sheets:

_In_ser t the following sheets:

/

Under General Information Section:

Pages:

Pages 1 thru 8 Pages:

Pages 1 thru 8 Under Tab 1 - Financial Statements:

Exnibits: Exhibit 3 Exhibits: Exhibit 3 Notes to Exhibit 3 Notes to Exhibit 3 Exhibit 4 Exhibit 4 (dated February 23, 1968)

Under Tab 2 - Annual Report to Shareholders:

Exhibits:

Exhibit 5 Exhibits: Exhibit 5 (dated February 21, 1968)

Under Tab 3 - Technical Qualifications:

Exhibits: Exhibit 6 Exhibits: Exhibit 6 (Pages 1 thru 16)

(Pages 1 thru 19)

/~i

/Nock;t No. 50-302 and -303

..pril 8, 1968 D

AMENDMENT NO. 5 FLORIDA POWER CORPORATION Crystal River Plant Unit 3 knendment No. 5 to the Florida Power Corporation's Preliminary Safety Analysis Report consists of revised pages which indicate technical changes relating to the deletion of Unit k.

The following sheets of the Florida Power Corporation's Preliminary Safety Analysis Report are to be deleted; and, where appropriate, revised sheets dated h-8-68 should be inserted.

Remove the following sheets:

Insert the following sheets:

Pqes:

1-1, 1-2, 1-3, 1-4, 1-5, Pages:

1-1, 1-2, 1-3, 1-4, 1-5, 1-6, 1-9, 1-10, 1-21, and 1-22.

1-6, 1-9, 1-10, 1-21, and 1-22.

Figures:

1-2, 1-3, 1-4, 1-5, Figures:

1-2, 1-3, 1-k, 1-5, 1-6, 1-7, 1-9, 1-10, 1-11, 1-12.

1-6, 1-7, 1-9, 1-10, 1-11, 1-12.

Pages:

h-27, 4-28, 4-29, and Pages:

h-27, h-28, 4-29, and h-30.

4-30.

Pages:

6-13 and 6-14.

Pages: 6-13 and 6-1h.

Pages:

7-6a.

Pages:

7-6a.

Pages:

8-1, 8-2, 8-2a, 8-3, 8-4 Pages:

8-1,,8-2, 8-2a, 8-3, 8-4, 8-5, 8-6, 8-7, 8-8, 8-9, 8-10, 8-?',,

8-5, 8-6, 8-7, 8-8, 8-9, 8-10, 8-11, 8-12, and 8-13.

8-12, and 8-13.

Figures: 8-1 and 8-2.

Figures:

8-1 and 8-2.

Pages:

9-vi, 9-5, 9-6, 9-7, 9-8, Pages:

9-vi, 9-5, 9-6, 9-7, 9-8, 9-15, 9-16, 9-17, 9-18, 9-21, 9-22, 9-15, 9-16, 9-17, 9-18, 9-21, 9-22, 9-22a, 9-23, 9-24, 9-25, 9-26, 9-22a, 9-23, 9-24, 9-25, 9-26, 9-31, and 9-32.

9-31, and 9-32.

Figures:

9-2, 9-3, 9-4, 9-5, 9-6, Figures:

9-2, 9-3, 9-4, 9-4b, 9-5, 9-7, 9-8, and 9-11.

9-6, 9-7, 9-8, and 9-11.

Pages:

11-5, 11-6, 11-7, 11-8, 11-9, Pages:

11-5, 11-6, 11-7, 11-8, 11-9, 11-10, 11-25, 11-26, 11-27, 11-28, 11-10, 11-25, 11-26, 11-27, 11-28, 11-29, and 11-30.

11-29, and 11-30.

Figures:

11-1.

Figur ir,:

11-1.

Pages: 12-1 and 12-2.

Pages.

12-1 and 12-2..

A

,\\

Remove the following sheets:

Insert the following sheets:

Figures:

12-1.

Figures:

12-1.

Pages:

14-41, lk kla, 14 klb, P es: 14-41, lk-kla, lk-klb, 14-klc, 14-kld, and 1k-42, 1 - 1c, 14-k1d, and 1k-42.

Figures: lk-kha, 14-khb, lk-hke, Figures: lk-kha, lk-khb, 14-kke, 14-khd, 1k-khe, and 1k-kkf.

lk-khd, lk-kke, and 14-kkf.

Revisions to Supplement No. 1 (Volume k)

Remove the following sheets:

Insert the following sheets:

Pages:

1.2-1 and 1.2-2.

Pages:

1.2-1 and 1.2-2.

Pages:

5.8-1 and 5.8-2.

Pages:

5.8-1 and 5.8-2.

Figures:

5.8-1, 5.8-2, 5.8-3, Figures:

5.8-1, 5.8-2, 5.8-3, 5.8-4, 5.8-5, and 5.8-6.

5.8-4, 5.8-5, and 5.8-6.

Figures:

8.6-1.

Figures:

8.6-1.

Pages:

9.11-5 and 9.11-6.

Pages: 9.11-5 and 9.11-6.

I i