ML19308E224
| ML19308E224 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 11/11/1975 |
| From: | Schwencer A Office of Nuclear Reactor Regulation |
| To: | Rodgers J FLORIDA POWER CORP. |
| Shared Package | |
| ML19308E225 | List: |
| References | |
| NUDOCS 8003240767 | |
| Download: ML19308E224 (2) | |
Text
_. __
& e s.
...i 65,7
- ![ < Th f
e.-
y n
vA
. pyg,,
. -c o m m
.h r.
5 DISTRIBUTION:
NRC PDR TIC L PDR PF Docket No.: 50-302 Docket File' becs: J. R. Buchanan, LhR 2-3 Rdg ORNL Nov.1 1 1975 VAMoore T. B.Abernathy, RHeineman ITTIE hMcDonald Florida Power Corporat, ion thR TC's ATIN: Mr. J. T. Rodgers ELD Assistant Vice President IE (3) 4 Nuclear Project Manager LEngle%
P'. O. Box 14042 EGoulbourne
.'l St. Petersburg, Florida 33733 1R BC's LhR BC's
)
Gentlemen:
ACRS (16)
'We have cmpleted our review of topical report BAW-10003, Revision 4,
'Qtulification Testing of Protection System Instnnentation." You have referencred this report as applicable to RPS equi ment qualification testing l
in the FiAR for Crystal River, Unit 3 (CR-3).
As a result of our review, we have concluded this report provides an accept-able basis for qualification of equipnent for CR-3. Acceptability of this report requires that you address Section 6 of our evaluation of BAW-10003, Revision 4 pInvided in the enclosure to this letter.
In order to maintain our licensing schedule, we will need your responses to Section 6 of the enclosure by December 5,1975. If you cannot meet the response date, please inform us within seven (7) days after receipt of this letter so that we may revise our scheduling.
Please contact us if you have any questions regarding the enclosure provided.
Sincerely, Oron: sineiii A. Schwencer, Chief Light Water Reactors Branch 2-3 Division of Reactor Licensing
Enclosure:
Topical. Report Evaluation ecs: See next page f
o
>c = > x7 3 :
3 RL r
11/q/75 80OT encer_
' e-11 10/75 oats >
Foran AEC.313 (Rev. 9-53) AECM 0240 W u. s. oovsanuswr paiwTime orrces sers.sas.ese
,i Florida Power Corporation ces: Mr. B. Simpson Project Manager Florida Power Corporation P. O. Box 14042 St. Petersburg, Florida 33733
- Mr. S. A. Brandimore Vice President G General Counsel Florida Power Corporation P. O. Box 14042 St. Petersburg, Florida 33733 l
orrecs > -
svanaess >
mars k Poes AEC.3IS (Rev.F53) AECM 0240 W u. s. oovanness=, paintene oprics: sera.sas.ese
~
~
><m
-,.-s_,-4