ML19308E195
| ML19308E195 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 02/15/1974 |
| From: | Schwencer A US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Rodgers J FLORIDA POWER CORP. |
| References | |
| NUDOCS 8003240734 | |
| Download: ML19308E195 (1) | |
Text
f
~ -
../
-/
~
,o L
l
...__._._.a
. --- -- -. " DISTRIBUTI'.N : "*"~~ ~ '
AEC PDR al PDR ocket LWR 2-3 Rdg Docket No. 50-302 RP Rdg pg I I %
VAMoore DEisenhut BCBuckley EIGoulbourne Florida Power Corporation OGC ATTH: Mr. J. T. Rodgers R0 (3) 1 Assistant Vice President RWKlecker and Nuclear Project Manager ASchwencer l
P. O. Box 14042 ACRS (16)
St. Petersburg, Florida 33733 5 extra eps Gentlemen:
At the present time your proposed Technical Specifications for Crystal River Unit 3 include an Inservice Tendon Surveillance Program (Section 15.4.2.1).
The AEC has published guidance for the preparation of th:.le programs as Regulatory Guide 1.35. Inservice Surveillance of Ungrouted Tendons in Prestressed Concrete Containment Structures (February 5. 1973). As part of your Technical Specifications you will be required to have a tendon surveillance program not necessarily identical to but at least equivalent to the program suggested in Regulatory Guide 1.35.
We have evaluated the program you proposed in Section 15.4.2.1 of the Technical Specifications and find it imacceptable. Please notify us within two weeks of the receipt of this letter of your proposal for an acceptable Tendon Surveillance Program.
Sincerely, Original Signed A. Schwencer, Chief
~
Light Water Reactors Br. 2-3 Directorate of Licensing cca S. A. Brandimore Vice President & General Counsel
.. O. Box 14042 St. Petersburg, Florida 33733 g p C'
_,,_ LWR 2-3 L:C/ LWR 2-3 a t.' e " '
r
.,,.c.,
'pik
~
-ASphejnt t
Edhuukicyskaf r"~
2/ I(
/.74 _2/._/y_._ /74 l
o.'s
- I Form AEC.318 (Re. 9 93) AECM 0240 aco can se e s ees.
eso.as4 023Y.-.
.