ML19308E025
| ML19308E025 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 01/24/1973 |
| From: | Schwencer A US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Rodgers J FLORIDA POWER CORP. |
| References | |
| NUDOCS 8003200758 | |
| Download: ML19308E025 (1) | |
Text
]
c.
3,.
j.
.~ -.i-.
Docket No. 50-302 JAN 2 4 ISD Florida Power Corporation ATTN:
J. T. Rodgers Assistant Vice President &
Nuclear Project Manager P. O. Box 14042 St. Petersburg, Florida 33733 j
Gentlemen:
It is our understanding that the Babcock & Wilcox topical report, BAW-10029, " Control Rod Drive Mechanism Test Fi-w m," is referenced in the Final Safety Analysis Report for Crystal River Unit 3.
Enclosed for your information is a copy of our letter to B&W presenting the results of our evaluation of this report. Please contact us if you desire any discussion or clarification of this matter.
Sincerely.
Origina1 Signedby Altiert Schwencer 4
A. Schwencer, Chief Pressurized Water Reactors Branch No. 4 Directorate of Licensing DISTRIBUTION
Enclosure:
Docket OGC l
Ltr to B&W dtd 1/22/73 AEC PDR R0 (3) t Local PDR REKHMgH H
. cc w/ enc 1:
RP Reading HJFaulkner S. A. Brandimore PWR-4 Reading EGoulbourne(2) 4 Vice President and General CounselSHHanauer P. O. Box 14042 RBBoyd
'St. Petersburg, Florida 33733 RCDeYoung DSkovholt FSchroeder RRMaccary DXnuth
' RTedesco HDenton PWR Branch Chiefs RWKlecker L6 omcE..U.N. 4/
.k2 4
HJFa,k_er:emp AS
.encer m,
om>.1/[H3...h.....Ub72 Poema AEC-Ste (Res. 9-53) ABCM 0240 du s.oovemensur peste.o orect-t972-466-983 8003200 ])
-