ML19308E007

From kanterella
Jump to navigation Jump to search
Denies Applicant Proposed Deviations from Reg Guide 1.35 Re Large Tendon Sys Surveillance.Structural Engineering Branch Input to SER Will Be Based on Nonconformance to AEC Position
ML19308E007
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/20/1973
From: Maccary R
US ATOMIC ENERGY COMMISSION (AEC)
To: Deyoung R
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19308E008 List:
References
NUDOCS 8003200742
Download: ML19308E007 (2)


Text

.

- x-,.s-w w -~ z, D W 1

.~.m..

-r 9

y c

.t

., _ ;s,

f.

;n..

. ry

~

[ 4,t6 '

J'

^.

. m.'.: : U '!e t '

Distribution:.

/

~

tEC' 2 0 S3 Docket File 50-302 L-Rdg SEB RF Docket No. 50-302 R. C. DeYoung, Assistant Director for Light Water Reactors,. Group 1 Directorate of Licensing FLORIDA POWER CORPORATION, CRYSTAL RIVER UNIT NO. 3, FINAL TECHNICAL SPECIFICATION POSITION Plant Name: Crystal River Unit i4. 3 Licensing Stage:

FSAR - GL Review Decket Mumber: 50-302 Responsible Branch and Project Manager: LUR 2-3, 8. Buckley Requested Cc pletica Date: Decenter 7,1973 Applicant's Res;cnce Date Necessary for Cc:-oletion of Fext Acticr.

Planned on Project: None Recuired Cescri?tuin of Response: Fosition Statanent on Technical Specificaticns Revlev: Status:

Co@leta As indicated by Us 5tructural Eacir.eering Branch n'_corandun, dated ad2r 7, U73, the is:ue over t?nnon w >eillanca had nor Wn rescived at that time. Upon reviewing & justifications provied by the applicant fer his ommed deviations from Re alatory Guide 1.2S the Structural Er.gineering Brancn has daterinined 2at tra current state of exparience with large tendon systets is not extensive enough to permit acecotance of the applicants proaosed program.

Re aoplicant has stated that thera is no ohysical reason for his not meeting the criteria. Consequently, it is cae intant of the Structural Engineering Branch to proceed with the writing of the SEB input to the SER based on the applicant's nonconformance to the Regulatory Staff's position.

n111, m

1D ~Q~T R. R. Maccary, Assistant Director for ngineering i

.A a

Directorate of Licensing

.s

Enclosure:

Nemo to 3. Euckley dated 12/7/73 A. Giambus.so, L A. Schwencer L

-8 0 0 3 2 0 0 % J u: y[

cc w/ encl:

-m. u, &.

4

.m r, &

omerM...Hanauer.lRTA.

L _shael L.1 -

_t.Sta..#'r. t:Sta. _

L:4 cts ~.~

Jj J{ liendric, L. l B. Buck: ey, L.

x7341 sumime.

n p -- --kar L

..RShev xshib LCS$to.

Doy:ccwy.. !

mrr.,

12//3 /73 12/p/73 12/ /73 Form AEC-)IS Rev.9 53; ASCM 0240

.4a-a-saans-3. 44ms t

_