Florida Pw m.o...e..r June 25, 1973 Mr. S. E. Kruesi, Director
~
The Directorate of Regulatory Operations U.S. Atomic Energy Commission Washington, D.C. 20545
Subject:
Crystal River Plant - Unit #3 Docket No. 50-302
Dear Mr. Kruesi:
On June 20, 1973, Florida Power Corporation advised the DR0 Region II office of our possible involvement in a situation which could be considered reportable under Federal Regulation 10 CFR50.55(e). This situation involved incomplete documenta-tion in the weld filler material records for reactor vessels, closure heads, and pressurizers fabricated by the Babcock &
Wilcox Company. O A report on the investigation of these records was submitted to the Atomic Energy Commission by Babcock & Wilcox..A copy of the report, BAW-1403, identifying our involvement will be maintained at the Crystal River Unit #3 site.
Please advise if further information on this matter is required.
Vety truly yours, FLORIDA POWER CORPORATION r..f
&f" ge Richard E. Raymond
~
Senior Vice President RER/iw cc: Mr. Norman Moseley Director, Region II 8 0 03191 o P3 General O' fica 32C1 Thirtv tour:n Street Soutn. P O. Box 14042. St. Petersburg. Fionda 33733 813 - 866 5151