ML19308D778

From kanterella
Jump to navigation Jump to search
Responds to Util Re Diesel Generator Lockout Problem.Forwards NRC Positions & Requests Response within 30 Days
ML19308D778
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 07/06/1978
From: Reid R
Office of Nuclear Reactor Regulation
To: Stewart W
FLORIDA POWER CORP.
Shared Package
ML19308D776 List:
References
NUDOCS 8003130823
Download: ML19308D778 (3)


Text

_ _ _ _ _ _ _

4 s

4 O..

DIsTRIsuTION:

July 6,1978

/AT6cket NRC PDP, L PDR ORB #4 Reading Docket No. 50-302 RWReid

)

1 RIngram CNelson 0 ELD OI&E(3)

Florida Power Corporation DEisr.nhut ATTN: Mr. W. P. Stewart TAbernathy Director, Power Production

.Tduchanan Post Office Box 14042, Mail Stop C-4 ACRS(16)

St. Petersburg, Florida 33733 BGrimes/TCarter Gray file Gentlemen:

TWambach J

RE: CRYSTAL RIVER UNIT NO. 3 Enclosed are staff positions that have been developed as a result of our review of your letter dated May 20, 1977, concerning the diesel generator lockout problem at Crystal River Unit No. 3.

You should provide a statement that your diesel generator system meets the staff positions, will meet the staff positions, or provide a justification for your objection and submit an alternate solution to the concern.

In either case, you are requested to provide a description of any proposed modifications which result. It is requested that~you respond to the above request within 30 days from the date of this letter.

Sincerely, Robert W. Reid, Chief Operating Reactors Branch #4 Division of Operating Reactors

Enclosure:

Staff Positions cc w/ enclosure:

See next page o

M eo ORB #4:D(W OR3#1jDOA C-0RBf4fD0_R Q @ g i D(>@

.,,,e,,

CNe(LNN:dn Tdmb'h GN[s6d a

7/1/_78 7/.I/78 76118_.

'l.h h%

3oo3oe8 n

s.

Florida Power Corporation

- cc: 'Mr. S. A. Brandimore i

Vice President and General Counsel P. O. Box 14042 St. Petersburg, Florida 33733 Crystal River Public Library Crystal River, Florida 32629 l

i l

f i

1 l

A O

I 4

e I

I i

,a

o

.. ~

STAFF POSIT 10:S DIESEL Grt!C!% TOR LOct007 1.

All shared annunciators for disability conditions shculd E.6t be able to be c1 cared until all abnorc:a1 conditions are corre/tzd.

2.

If a diesel generator is provided with a manual shutdown lockout relay, an alarm should be provided which is worded to clearly indicate the diesel generator is incapable of an autocatic start when the

- relay is not set.

4 9+

0 0

h 6

e O

e O'

4 O

e e

O S

P s.

  • e - emae*

-