ML19308D778
| ML19308D778 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 07/06/1978 |
| From: | Reid R Office of Nuclear Reactor Regulation |
| To: | Stewart W FLORIDA POWER CORP. |
| Shared Package | |
| ML19308D776 | List: |
| References | |
| NUDOCS 8003130823 | |
| Download: ML19308D778 (3) | |
Text
_ _ _ _ _ _ _
4 s
4 O..
DIsTRIsuTION:
July 6,1978
/AT6cket NRC PDP, L PDR ORB #4 Reading Docket No. 50-302 RWReid
)
1 RIngram CNelson 0 ELD OI&E(3)
Florida Power Corporation DEisr.nhut ATTN: Mr. W. P. Stewart TAbernathy Director, Power Production
.Tduchanan Post Office Box 14042, Mail Stop C-4 ACRS(16)
St. Petersburg, Florida 33733 BGrimes/TCarter Gray file Gentlemen:
TWambach J
RE: CRYSTAL RIVER UNIT NO. 3 Enclosed are staff positions that have been developed as a result of our review of your letter dated May 20, 1977, concerning the diesel generator lockout problem at Crystal River Unit No. 3.
You should provide a statement that your diesel generator system meets the staff positions, will meet the staff positions, or provide a justification for your objection and submit an alternate solution to the concern.
In either case, you are requested to provide a description of any proposed modifications which result. It is requested that~you respond to the above request within 30 days from the date of this letter.
Sincerely, Robert W. Reid, Chief Operating Reactors Branch #4 Division of Operating Reactors
Enclosure:
Staff Positions cc w/ enclosure:
See next page o
M eo ORB #4:D(W OR3#1jDOA C-0RBf4fD0_R Q @ g i D(>@
.,,,e,,
CNe(LNN:dn Tdmb'h GN[s6d a
7/1/_78 7/.I/78 76118_.
'l.h h%
3oo3oe8 n
s.
Florida Power Corporation
- cc: 'Mr. S. A. Brandimore i
Vice President and General Counsel P. O. Box 14042 St. Petersburg, Florida 33733 Crystal River Public Library Crystal River, Florida 32629 l
i l
f i
1 l
A O
I 4
e I
I i
,a
o
.. ~
STAFF POSIT 10:S DIESEL Grt!C!% TOR LOct007 1.
All shared annunciators for disability conditions shculd E.6t be able to be c1 cared until all abnorc:a1 conditions are corre/tzd.
2.
If a diesel generator is provided with a manual shutdown lockout relay, an alarm should be provided which is worded to clearly indicate the diesel generator is incapable of an autocatic start when the
- relay is not set.
4 9+
0 0
h 6
e O
e O'
4 O
e e
O S
P s.
- e - emae*
-