ML19308D773

From kanterella
Jump to navigation Jump to search
Forwards to All PWR Licensees,Notice of 780907-08 Conference in Bethesda,Md to Discuss Design Integration & Insp & Operating Procedures to Ensure Greater Safety & Reliability. Tentative Agenda Encl
ML19308D773
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/09/1978
From: Eisenhut D
Office of Nuclear Reactor Regulation
To:
FLORIDA POWER CORP.
References
NUDOCS 8003130818
Download: ML19308D773 (5)


Text

a j#

UNITED STATES g

  • g NUCLEAR REGULATORY COMP'.sSSION o

WASHINGTON, D. C. 20066 5

I

\\...../

August 9, 1978 ALL PWR LICENSEES Gentlemen:

The Division of Operating Reactors, Office of Nuclear Reactor Regulation, has organized a two-day PWR Steam Generator Conference to be held at the Holiday Inn in Bethesda, Maryland on September 7 and 8,1978. The purpose of the conference is to provide an oppor-tunity for industry, government, national laboratory, foreign, and possible public representatives to present and discuss operating experience relevant to steam generators and to exchange ideas for integrating design, inspection and operating procedures to ensure more reliable, safe operation of steam generators at nuclear power facilities.

Attached for your use is a Notice of the Conference and a tentative agenda.

Please notify Dr. B. D. Liaw, Division of Operating Reactors, U. S.

Nuclear Regulatory Comission, Washington, D. C. 20555, telephone (301) 492-8060 of your intent regarding attendance at the conference by August 25, 1978.

'(

b 4) iserhut4Asistan9g 6

rector for Systems and Projects Division of Operating Reactors

Enclosures:

1.

Notice of Conference 2.

Tentative Agenda

.g3 80081308/G"

ENCLOSURE N0. 1 v

CONFERENCE NOTICE The Nuclear Regulatory Commission will sponsor a two-day pressurized Water Reactor Steam Generator Workshop at the Holiday Inn in Bethesda, Maryland on September 7 and 8,1978. The purpose of the workshop is to provide an opportunity for industry, government, national laboratory and foreign organizations, and possibly, public representatives to present and discuss operating experience relevant to steam generator tube degradation and to exchange ideas for integrating design, inspection and operating procedures to ensure safe operation of steam generators at nuclear power facilities. The workshop will be comprised of presentations by invited speakers followed by a panel discussion, Requests for additional information, including requests to participate, should be addressed to Dr. B. D. Liaw, Division of Operating Reactors, U. S. Nuclear Regulatory Commission, Washington, D. C.

20555. Telephone (301) 492-8060.

A tentative agenda of the workshop is attached.

m O

ENCLOSURE NO. 2 PRESSURIZED WATER REACTOR STEAM GENERATOR WORKSHOP

, DIVISION OF OPERATING REACTORS OFFICE OF' NUCLEAR' REACTOR REGULATION U. S. NUCLEAR REGULATORY 'COPMISSION WASHINGTON,'D. C.

20555 General Chairman: Darrell G. Eisenhut, Assistant Director for Systems and Projects Division of Operating Reactors September 7,1978 8:00 a.m.

- Regic INTRODUCTORY SESSION:

D. G. Eisenhut Opening and Welcome Remarks (V. Stello) 9:00 a.m.

9:10 a.m.

Licensing Bases for Continued Operation of PWR Steam Generators (D. G. Eisenhut)

NRC Confirmatory Research Programs (C. Z. Serpan) 9:30 a.m.

- Coffee Break -

GENERAL SESSION:

L. C. Shao Westinghouse Steam Generator Operating Experiences 10:00 a.m.

(Representative - Westinghouse Electric Corporation)

Combustion Engineering Steam Generator Operating 10:30 a.m.

Experiences (Representative - Combustion Engineering)

B&W Steam Generator' Operating Experiences 11:00 a.m.

(Representative - Babcock & Wilcox, Inc.)

- Lunch Break -

. TECHNICAL SESSION I:

J. P. Knight 1:30 p.m.

- Eddy Current Inspection Method Evaluation (Representative - Battelle Columbus) 2:00 p.m.

- Advanced ECT Probe Development (Representative-ZETEC,Inc.)

2:30 p.m.

- PNL Steam Generator Tube Integrity Program (Representative - Pacific Northwest Laboratory)

- Coffee Break -

3:30 p.m.

- BNL Stress Corrosion Tests (Representative - Brookhaven National Laboratories) 4:00 p.m.

- DOE Chemical Cleaning Program (Representative - U. S. Department of Energy)

September 8,1978 TECHNICAL SESSION II:

B. D. Liaw 9:00 a.m.

- Model Boiler Test for Reproducing Tube Denting)

(Representative - Combustion En(teaa.rtng, Inc.

C:30 a.m.

- Improved Westinghouse Steam Generator Design to Avoid Various Forms of Tube Degradation (Representative - Westinghotte Electric Corporation -

10:30 a.m.

- Experience with Condenser Failures, Retubing and Consequence (Representative - Westinghouse Electric Corporation) 11:00 a.m.

- Turkey Point Steam Generator Replacement Program (Representative - Bechtel Power Corporation)

- Lunch Break -

6

-,r-

---. * ~

1:30 p.m.

- PANEL DISCUSSIONS:

D. G. Eisenhut Panel Members:

J. R. Weeks. L. Frank, J. Muscara, J. Scinto, F. Almeter, B. D. Liaw, and various industry representatives

. Need for Secondary Water Chemistry Control

. Steam Generator Tube Denting, Support Plate Cracking and Defonnation

. Regulation and Regulatory Guide Interpretations -

Tube Plugging Criteria, ISI Requirements

. Development ECT Inspection Techniques Additional Research Programs

'S e

l l

.-y

-m

--g--

y

UNITED STATES f

]

NUCLE AR REGULATORY COMMISSION W ASHINGTON, D. C. 206SS POST AGE AND PRES PA4D U.S. NUCLE A R RE GULATOR Y OPPICI AL SUSINESS COMuestsoM PEN ALTY FOR PRIVATE USE, $300 k

j 1

1 I

l t

___