Text
_
'e
'
.
'I
UNITED 'iTATES
'
'N
NUCLEAR REGULATORY COMMISSION
REGloN 11
230 PE ACHTR EE STR CET. N. W.
SulTE SIS
ATLANTA.CEORGIA 30303
In Reply Refer To:
JUL 181!T/5_
~
s
IE:II:IMI
,
50-302/75-8
.
,
Florida Power Corporation
_
Attn:
Mr. J. T. Rodgers
Assistant Vice President
.
Quality and Environmental Departments
3201 34th Street, South
P. O. Box 14042
,
St. ~ Petersburg, Florida
33733
Gentlemen:
This refers to. the inspection conducted by Messrs. K. W. Whitt and G. L. Troup
of this office on June 17-20 and 24-26,1975, of activities authorized by
NRC Construction Permit No. CPPR-51 for the Crystal River facility, and to
the discussion of our findings held with Messrs. J. C. Hobbs Jr. and J. R. Wright
at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examination of procedures and representative. records, interviews
with personnel, and observations by the inspector.
-
We have examined actions you have taken with regard to previously reported
unresolved items. These are identified in Section IV of the summary of the
enclosed report.
Eight new unresolved items resulted from this inspection and are identified
in Section III of the summary of the enclosed report. These items will be
examined during subsequent inspections.
During the inspection, it was found that certain activities under your
license appear to be in noncompliance with NRC requirements. This item
and reference to pertinent requirements are listed in Section I of the
summary of the enclosed report. Corrective actions to prevent recurrence
were completed prior to the conclusion of this inspection; therefore, a
reply to this item of noncompliance is not requested.
N
otUTIO
L),
N*q
-
L
d
5
V
'%
/
- 76 19 8
~
8003030/tfy p
-
.
.- .
-. --
.
--. .
-
.
. - - -
.
.-
_
jut.181975
,3
q
.
-
.
Florida Power Corporation
-2-
(
j
.
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
,
Part 2, Title 10, Code of Federal Regulations, a copy of- this letter
and the enclosed inspection report will be placed in the NRC's Public
Document Room.
If this report contains any information that you believe
'
to be proprietary, it is necessary that you submit a written application
to this office requesting that such information be withheld from public
disclosure. If no proprietary information is identified, a written
,
statement-to that effect should be submitted.
If an application is
-
submitted, it must fully identify the bases for which information is
.
claimed to be proprietary. The application should be prepared so that
information sought to be withheld is incorporated in a separate paper
,
and referenced in the application since the application will be placed
,
in the Public Document Room. Your application, or written statement,
should be submitted to us within 20 days. If ne are not contacted as
specified, the enclosed report and this letter may then be placed in
the Public Document Room.
Should you have any questions concerning this letter, we will be glad
to discuss them with you.
Very truly yours,
O
.
y' , r,'
' , ,
-
.
,
. n ci~. ~
. ,/
c.
Norman C. Moseley
Director
Enclosure:
IE Inspection Report
,
No. 50-302/75-8
)
i