ML19308D557

From kanterella
Jump to navigation Jump to search
RO-77-75:on 770702,absolute Position Indication for All Regulating Rods Lost While Performing Operability Test on Rod 3 Group 6.Caused by Crowbarred 15 Volt Power Supply Due to Spike of Unknown Origin.Sys Restored
ML19308D557
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 07/28/1977
From: Stewart W
FLORIDA POWER CORP.
To:
Shared Package
ML19308D554 List:
References
NUDOCS 8002280987
Download: ML19308D557 (2)


Text

_ __

i Lil,tlWtt CV CPJ i MCPUMI ik*

  • CONTROL BLOC.

l l

l l

l l

(PLEASE PRINT ALL RtCUtRED INFCRM AT*C.

{

1 6

i

[

~

AME UCENSE NUMBER PE (J l FlL l ClR lP l3 l l0 l0 l-l0 l 0 l 0 l 0 l 0 l-l 0 l 0 l l 4 l1 l1 l1 l 1l l0 l3 l

,7 89 14 15 25 26 30 31 32

" 7PE EVENT oATE REPORT CATE CATEcoRY T

E CoCKET NUMBER 0 1 CON'T l l _ l l Ll lo l5 l0 l-l0 l3 l0 l? l l0 l7 l0 l2 l7 l7l l 0 l 7 l2 l8 l7 l~,

7 8 57

$8 59 60 61 68 69 74 75 t

EVENT DESCRIPTION gg l In mode 2 operation while performing operability test of rod 3 group 6 API, the absolute j

7 89 t !

Ql position indication for all regulating rods was lost, creating a ec.2dition as defined 7 89 L

Ql by Tech Spec 3.0.3.

Redundancy was maintained with the relative position indication.

7 89 L l Ql This was a non-repetitive occurrence. Maintenance restored the API system operable 7 09 (LER 77-75)

E DE l within 8 minutes.

7 89 E,

m,,

EE CCCE COMpor4ENT CCCE ACT 4

VCLATCN Q lIl Dl lF l l Il Nl S l Tl Rl Ul lNl l Dl1 l 5 l 0 l g

7 89 10 11 12 17 43 44 47 48 CAUSE DESCRIPTION

'p

~

l The 15 volt power supplies for the API system crowbarred due to a spike of unknown e

7 89 6-0 l origin and were reset restoring system operability; f

6 9

E l

's'TE

% POWER oTHER STATUS

-Cr5 CVERY e6 COWRY CESCMT:CN Q

]

[0 l0 l0 l l NA l

l Al l

1A 70 9

10 12 13 44 45

'46 8.

ACTMTV CCATENT RELEASEO CF RELEASE l AMCUNT OF ACTMTV LOCAT:CN CF RELEASE y

NA l

l NA

]

1 7 8

.9 10 11 44 45 St PERSONNEL EXPOSURES NUMBER TYPE DESC341PTICN Q l0 l0 l0 l Wl NA 7 89 11 12 13 Es PERSONNEL INJUAIES NUMBER DESCRPTON E l0l0l0_l l

NA 7 89 11.12 SC OFFSITE CONSECUENCES

,Ql NA l

7 89 Bt LOSS OR OAMAGE TO FAC:UTY TYPE CESCRPTON bl NA 1

7 89 10 LC PUBUCITY l

17 l NA I

7 89 UC ADDITIONAL FACTORS

}l See attached Supplementary Information as89 8 0 02 280 fp 7 89 to NAME:

W. P. Stewart (813) 866-4159 PHONE:

_q,- l cPo one.ssT l

~

~

~

SUPPLDfENTARY INFORMATION

~,,..

N.

Report No.: 302/77-75 2.

Facility:

Crystal River Unit #3 4

3.

Report Date:

28 July 1977 4.

Occurrence Date:

2 July 1977 5.

Identification of Occurrence:

The loss of all absolute position indication resulted in a limiting condition for operation in excess of those addressed in the Specifications as defined by Technical Specification 3.0.3.

6.

Conditions Prior to Occurrence:

Mode 2 startup operation.

7.

Description of Occurrence:

At 0435 while performing operability test of the absolute position indication of rod 3 of group 6, the absolute position indication for all rods was lost. The Electrical Supervisor i was immediately notified and preparations were made to go to hot standby within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, as required by Technical Specifications. The v.ssolute position indication system was restored operable within 8 minutes.

Designation of Apparent Cause:

An apparent, spike from an unknown origin causet a crowbar of the API 15 alt power supplies. The power supplies were reset and th 1 API system restored operable.

9.

Analysis of Occurrence:

3 There were no safety implications as a result of this occurrence.

10.

Corrective Action:

No corrective action deemed necessary as normal maintenance restored system operability.

11.

Failure Data:

i This was not a repetitive occurrence.

-