ML19308D555
| ML19308D555 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 12/13/1977 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | FLORIDA POWER CORP. |
| Shared Package | |
| ML19308D556 | List: |
| References | |
| NUDOCS 8002280986 | |
| Download: ML19308D555 (2) | |
See also: IR 05000302/1977023
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ - _ _ _ _ - - _ _ _
.
,.
~.
m
UNITED STATES
./
^( ' ,
- " "'C&q(o
NUCLEAR REGULATORY COMMISSION
.
,,
,
R EGloN 11
g
g .]
..E
230 PEACHTREE STRE ET, N.W. SUITE 1217
E
o
ATLANTA, GEORGI A 30303
%
CEO 131977
- ...
In Reply Refer To:
Ril:DJB
50-302/77-23
Florida Power Corporation
Attn:
Mr. W. P. Stewart
Power Production
t
P. O. Box 14042, Mail Stop C-4
St. Petersburg, Florida 33733
Gentlemen:
This refers to the inspection conducted by Mr. D. J. Burke of this
office on November 29-December 2, 1977, of activities authorized by NRC
Operating License No. DPR-72 for the Crystal River 3 facility, and to
the discussion of our findings held with Mr. G. P. Beatty, Jr. at the
conclusion of the inspection.
m
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
'
records, interviews with personnel, and observations by the inspector.
l
Within the scope of this inspection, no items of noncompliance were
1
disclosed.
1
In accordance with Section 2.790 of the NRC's " Rules of Practice",
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public
Document Room. If this report contains any information that you (or
your contractor) believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold
such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is
claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained
in a separate part of the document. If we do not hear from you in this
regard within the specified period, the report will be placed in the
Public Document Room.
TY
8 0 02 280 ypf C
.
._
. _ . ,
._. -
.. -
.-
- - -. -
.. .. .
_ ---_-.
. , -
- -
-- -
' $
a
,
,
'
m
,
?
. * . .
,
_
.
f
h
Florida Power Corporation
-2-
.
1
!
l
Should you have any questions concerning this letter, we will be glad to
!
discuss them with you.
.
Sincerely,
-
o
F. J. Ldhg, Chie
Reactor Operations and
Nuclear Support Branch
Enclosure: RII Inspection
Report No. 50-302/77-23
4
i
cc w/ encl:
Mr. G. P. Beatty, Jr.
Nuclear Plant Superintendent
P. O. Box 1228
Crystal River, Florida 32629
.
!
,
j
t
l
i
l
l. .
- .._ _-__
.
.
. .
. . . . .
- - . . . . . . .
- -
.
'
.
. .
.
. -
. .
.