ML19308D516

From kanterella
Jump to navigation Jump to search
Forwards RO-77-85
Date released: 11/18/2019 Download: ML19308D516


RO-77-85:on 770715,methyl Iodine Removal Efficiency Found Below Tech Specs Requirements During Reactor Bldg Charcoal Filter Bank Testing.Caused by Deteriorated Charcoal Due to Site Flue Gases & Air Pollutants.Charcoal Replaced 770806
ML19308D517
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/08/1977
From: Stewart W
FLORIDA POWER CORP.
To:
References
Download: ML19308D517 (2)
Forwards RO-77-85
ML19308D515
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/08/1977
From: Stewart W
FLORIDA POWER CORP.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19308D515 (1)