IE FILE COPY
,
.s
n
umTEo:TaTes
4
'
g
NUCLEAR REGULATORY COMMISSIG..
.
o
-
REGloN il
{
3
230 PEACHTREE STREET. N.W. SUITE 1217
.
.....
DEC 3 01977
,
In Reply Refer To:
RII:SCE
50-302/77-22
i
Florida Power Corporation
4
Atta: Mr. W. P. Stewart
Power Production
1
i
P. O. Box 14042, Mail Stop C-4
i
St. Petersburg, Florida 33733
i
Gentlemen:
This refers to the inspection conducted by Mr. S. C. Ewald of this
office on November 14-18, 1977, of activities authorized by NRC
Operating License No. DPR-72 for the Crystal River 3 facility, and to
the discussion of our findings held with Mr. G. P. Beatty, Jr., at the
conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in
i
the enclosed inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspectors.
Within the scope of this inspection, no items of noncompliance were
disclosed.
We have examined actions you have taken with regard to previously
identified enforcement matters and unresolved items. The status of
these items is discussed in the enclosed report.
,
l
Three new unresolved items resulted from this inspection and is
!
discussed in'the enclosed report. These items will be examined during
subsequent injspections.
.
In accordance with section 2.790 of the NRC's " Rules of Practice",
Part 2, Title 10, Code of Federal Regulations, a copy of this letter
and the enclosed inspection report will be placed in the NRC's Public
Document Poom. If this report contains any information that you (or
your contractor) believe to be proprietary, it 10 necessary that you
make a written application within 20 days to this office to withhold
such information from public disclosure. Any such spplication must
include a full statement of the reasons on the basis of which it is
claimed that the information is proprietary, and shou.'d be prepared so
F
that proprietary information identified in the applicacion is contained
'*
in a separate part of the document.- If we do not hear from you in this
regard within the specified period, the report will be placed in the
Public Document Room.
8002 280 b
. . . _ .
- . . . .
. . . - . . - - - . . . . .
. . .
. . . . - . - . . . .
e
w , - - ,
.,y_
, - ~ - -
w -
.-..,y
--.,p.n_
,,-e-
y,-
, , - . - ,
-
%-e.,
-r--r
,
w -
-
.
- - - . - - - -.
,
'
DEU 3 01977
m
-
-
Florida Power Corporation
-2-
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
lY
',
Il
1~
-
I
J. T. Sutherland, Chief
- b Fuel Facility and Materials
]
Safety Branch
Enclosure:
Inspection Report No.
50-302/77-22
cc w/ enc 1:
Mr. G. P. Beatty, Jr.
Nuclear Plant Superintendent
P. O. Box 1228
Crystal River, Florida 32629
l
e
.=
\\
.-
,.
.
e
>