Forwards IE Insp Rept 50-302/77-22 on 771114-18.No Noncompliance Noted
ML19308D503
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/30/1977
From: Sutherland J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stewart W
FLORIDA POWER CORP.
Shared Package
ML19308D504 List:
References
NUDOCS 8002280816
Download: ML19308D503 (2)


See also: IR 05000302/1977022

Text

-

.

_

_

._

_

. < . , -

'

-

=.g#o

IE FILE COPY

,

.s

n

umTEo:TaTes

4

'

g

NUCLEAR REGULATORY COMMISSIG..

.

o

-

REGloN il

{

3

230 PEACHTREE STREET. N.W. SUITE 1217

ATI.ANTA, GEORGIA 30303

.

.....

DEC 3 01977

,

In Reply Refer To:

RII:SCE

50-302/77-22

i

Florida Power Corporation

4

Atta: Mr. W. P. Stewart

Power Production

1

i

P. O. Box 14042, Mail Stop C-4

i

St. Petersburg, Florida 33733

i

Gentlemen:

This refers to the inspection conducted by Mr. S. C. Ewald of this

office on November 14-18, 1977, of activities authorized by NRC

Operating License No. DPR-72 for the Crystal River 3 facility, and to

the discussion of our findings held with Mr. G. P. Beatty, Jr., at the

conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in

i

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspectors.

Within the scope of this inspection, no items of noncompliance were

disclosed.

We have examined actions you have taken with regard to previously

identified enforcement matters and unresolved items. The status of

these items is discussed in the enclosed report.

,

l

Three new unresolved items resulted from this inspection and is

!

discussed in'the enclosed report. These items will be examined during

subsequent injspections.

.

In accordance with section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter

and the enclosed inspection report will be placed in the NRC's Public

Document Poom. If this report contains any information that you (or

your contractor) believe to be proprietary, it 10 necessary that you

make a written application within 20 days to this office to withhold

such information from public disclosure. Any such spplication must

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and shou.'d be prepared so

F

that proprietary information identified in the applicacion is contained

'*

in a separate part of the document.- If we do not hear from you in this

regard within the specified period, the report will be placed in the

Public Document Room.

8002 280 b

. . . _ .

- . . . .

. . . - . . - - - . . . . .

. . .

. . . . - . - . . . .

e

w , - - ,

.,y_

, - ~ - -

w -

.-..,y

--.,p.n_

,,-e-

y,-

, , - . - ,

-

%-e.,

-r--r

,

w -

-

.

- - - . - - - -.

,

'

DEU 3 01977

m

-

-

Florida Power Corporation

-2-

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

lY

',

Il

1~

-

I

J. T. Sutherland, Chief

- b Fuel Facility and Materials

]

Safety Branch

Enclosure:

Inspection Report No.

50-302/77-22

cc w/ enc 1:

Mr. G. P. Beatty, Jr.

Nuclear Plant Superintendent

P. O. Box 1228

Crystal River, Florida 32629

l

e

.=

\\

.-

,.

.

e

>