ML19308D493

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-302/78-07 on 780329-31.No Noncompliance Noted
ML19308D493
Person / Time
Site: Crystal River 
Issue date: 04/19/1978
From: Sutherland J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stewart W
FLORIDA POWER CORP.
Shared Package
ML19308D494 List:
References
NUDOCS 8002280799
Download: ML19308D493 (2)


See also: IR 05000302/1978007

Text

_ ____ ________

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

,

.

    • "'C

[A-

%'o,

lLE CDP.

'

UNITED STATES

NUCLEAR REGULATORY COMMISSION

A

\\

f

') 2. (

R EGloN 11

.

g .' (

230 PEACHTREE STREET, N.W. SulTE 1217

/; [E

o, (U

ATLANTA, GEORGIA 30303

APR 191978

....

In Reply Refer To:

RII:DJP

.

50-302/78-7

Florida Power Corporation

Attn:

Mr. W. P. Stewart, Director

Power Production

P. O. Box 14042, Mail Stop C-4

St. Petersburg, Florida

33733

Gentlemen:

This refers to the inspection conducted by Mr. D. J. Perrotti of this

office on March 29-31, 1978, of activities authorized by NRC Operating

License No. DPR-72 for the Crystal River 3 facility, and to the discussion

of our findings held with Mr. T. Lutkehaus at the conclusion of the

inspection.

,

Areas examined t. ring the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

disclosed.

One new unresolved item resulted from this inspection and is discussed

in the enclosed report. This item will be examined during subsequent

inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter

and the enclosed inspection report will be placed in the NRC's Public

'

Document loom.

If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written applicaticn within 20 days to this office to withhold

such information from public disclosure. Any such applicatun must

include a full statement of the reasons on the basis of. which it is

claimed that the information is proprietary, and should be prepared

so that proprietary information identified in the application is

contained in a separate part of the document.

If we do not hear

from you in this regard within the specified period, the report

g,

will be placed in the Public Document Room. g

8002 280 l

-

9

,_

._.

__

.

APR 19197E

.

~

Florida Power Corporation

-2-

_

4

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

.

Sincerely,

f

A

B

i

[/. T. Sutherland, Chief

Fuel Facility and Materials

Safety Branch

.

Enclosure:

RII Inspection Report No.

50-302/78-7

cc w/ encl:

Mr. G. P. Beatty, Jr.

Nuclear Plant Superintendent

P. O. Box 1228

Crystal River, Florida 32629

'

,

I

,