ML19308D464

From kanterella
Jump to navigation Jump to search
Forwards RO-77-89
Date released: 11/18/2019 Download: ML19308D464


RO-77-89:on 770715,valve DHV-41 Failed to Open from Control Room During Cycling Surveillance Procedure.Caused by Shift in Torque Switch Setting.Torque Switch Contacts Burnished & Switch Reset
ML19308D470
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/09/1977
From: Stewart W
FLORIDA POWER CORP.
To:
References
Download: ML19308D470 (2)
Forwards RO-77-89
ML19308D463
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/09/1977
From: Stewart W
FLORIDA POWER CORP.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19308D463 (1)