ML19308D429
| ML19308D429 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 05/17/1977 |
| From: | Stewart W FLORIDA POWER CORP. |
| To: | |
| Shared Package | |
| ML19308D403 | List: |
| References | |
| NUDOCS 8002280732 | |
| Download: ML19308D429 (2) | |
Text
.
l 1
CONTROL DLOCK:,
l l
l l
l l
,O (pttAst PRINT ALL HEQUtRtD INFCTI.'.1A17 e
f A C LICENSE NUMUEA gl F l L l C l Rl P l 3l l0l0h-l0l0l0l0l0l-l0l0l l 4l 1 l1 l1 l1 l l 0l 3l l
y
^ TV5 E bdB 14 15 25 25 30 31 32 h
CAftConY tv DOCKET NUM0(A EVENT DATE REPORT DATE QCON'T l - l - l W[L_j l0l5l0l-l0l3l0l2l l 0l 4l 2 l5 l7 l7 l l0 l 5 l 1l 7 l 7 l,
7 0 b7 LU bU UU 61 60 09 74 75 a
EVENT DESCRIPTION o
l In Mode 1 operation in the process of checking ' completed Surveillance Procedure, Opera-7 09 t
Q j tions ES Monthly Furf$tional Tests (SP -355) had not been performed within the time frame 7 il 9 t
Ql specified in Technical Specification 4.3.2.1.1.
Redundancy N/A.
First occurrence of 4
7 HD r
0b l this event.
Investigation revealed that the scheduling of SP-355 had been brought up-to-7 HD t
bI anco nna furehor ncefnn une nne unernneoa_
(LER 77-42) 7 0S mME I-
- IEt Co"tY U1f
^
c coMPONfNT CODE S
M F
A VOLATON IIla l LOJ Izizizizizizi Iz l Izi919191 0
O 7 00 10 11 12 17 43 44 47 48 CAUSE DESCRIPTION 0
f, l
Failure to incorporate SP-355 in the Master Surveillance Plan SP-443 in time enough to o
7 09 L
00 l complete within the specif'-i % limit.
7 89 L..
F9 FACEffv M(THOD OF ST Af tis
% POWEn oTHER STATUS DiSCOVLny DISCOVinY DESCR.PTON Q
l El l 0l 8l 9l l
N/A l W l
N/A 70 9
10 12 13 44 45 46 0;
AC TM1Y CONTENT fif tf ASE D OF81EtfASEl AMOUNT OF ACTMTV LOCATON OF RELCISC d
d N/A l
l N/A 1
7 0 9
10 11 44 45 Os PERSONNEL EXPOSURES NUMOCA TYPE DESCRIPTON 35 l O l 0 l 0 l
[_zj l
N/A 7 09 11 12 13 Li PERSONNEL INJURIES NUM0fn OLSCRIPTON DE l0l0l0l l
N/A 7 89 11 12 i
Ut OFFSITE CONSEQUENCES
{
@l N/A i
7 oo ut LOSS OR OAMAGE TO FACILITY 1YPt Ot5Cn:PTON QS W l
N/A l
7 0D 10 M'
PUDLICITY 8i N/A i
7 0D Ut 8 0 02 280 2]R DOITIONAL FACTOnS ba Sco attached Supplementary In fo rmation
'"l 7 0D In:
i 7,
N.
Hu
/
~%.
l) b
- Uh l'.s._fitrnar.t__
NAMr:
neore_(RI_'l). 866-4159
8
.s L
[
t SUPPLEMENTARY INVORMATION
}
1.
Report No:
50-302/77-42 i
2.
Facility:
Crystal River Unit #3 3.
Report Date:
17 May 1977 I
.4.
Occurrence Date:
25 April 1977 i
5.
Identification of Occurrence:
I j
. Operations ES Monthly Functional Tests (SP-355) was not performed j
within the time frame specified by Technical Specification 4.3.2.1.1, Table 4.3.2.
i 1
6.
Conditions Prior to Occurrence:
g Normal Mode 1 steady state operation.
4
- f. :
7.
Description of Occurrence:
1 At 0945 while in the proce.ss of checking compler.ed Surveillance Pre-cedure SP-355, it was discovered that it had, not been performed,'ithin the required time f rame. Appropriate supervision was notified immedi-ately and an' investigation revealed that procedursi deficienclis in,SP scheduling had caused this occurrence. These deficiencies war,e cor-j rected and the schedule for SP-355 is up-tt date.
l R.
Designation of Apparent Cause of Occurrence:
1 An approved change to the Master Surve(11ance Plan SP-443 inc rporating the requirement for performance of SP-355 had not been distributed in i
time to meet the required due date.
l 9.
Analysis of Occurrence:
i There were no safety hazards associated with this event as performance i
of SP-355 demonstrated system operability.
10.
Corrective Action:
A. double check of all surveillance schedules was made and de : ermined to be correct.
In the future, procedural changes of Surveillance Procedures.
and schedules will be handled in a timely manner.
11.
Failure Data:
)
This is the first occurrence of this type, i
1 i
e
.,~
_.. _.., _... _ _ _. _,... _. - -