Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
wavue vuLa L46: 4s 6 as..
ve a i fr CONinOL ULOCK:[ ^
l l
l l
l
[pLCASE PRINT ALL HCQUIRED INFC'17.1 AT:C7:
I, 1
6 (CENSE EVENI NAME LICENSF NOMuf f)
T yg'[
T Y6*C vlLicl nl rl 3l 10 l 04-l 0l 0l 0l 0l 0l-l 0l 0l l4 l 1l1l1 l1 l l 0l 3l 14 1b 26 2G 30 31 32
" 7PE CAltGOHY 1
i DOCKET NUM0ER EVENT OAir.
REPOnf OatE hCONT l-l - l lLl l0l5l0l-l0l3l0l2l l 0l 4l 2 l 7 l7 l7 l l0 l5 l1l8l7l7 7 U 57 b0 59 60 61 60 69 74 75 OL EVENT DESCniPTION O
l In Mode 1 ooe ration performing SP-110, regulating rod Group 6 exceeded its insertion l
7 0D 03 l limit by 5% contraN to Technical Specification 3.1.3.6.
Ot Redundancy N/A.
First l
7 11 D U4 l occurrence of thh tvoe.
The Groun was adiusted to within soecified limits in 12 j
@l minutes.
CD l
7 00
@l 00 (LER-7 7-44) l 7 09 systru CAUSE CCP ENT COMPONCNT COOE CODE COMPOtJENT COCE SUPPLIER MANUFACTUAEA VOLATON Q lRlBl l Al lClRlDlRlVlEl lN l
[ Dj 1l5 l0 l l Nl 7 UD 10 11 12 17 43 44 47 48 CAUSE DESCn!PTION
'b l
Rod Group 6 moved out of its enveJope because of xenon buildup and having Group 7 fully l
90 hl insertPd with sequence override in effect.
Persohnel cautioned to monitor rod index l
00
/ It 9 limits more closely.
l 7
i ACuiv METHoo or STAtuG
% POWER OTHER STATUS 06SCOVE4Y OISCOVEnY OESCRIPTON Q~
(Ej l 0l 8l 6l l
N/A l W l
N/A l
/0 9
10 12 13 44 46 46 00 FOHM OF ACIMtY CONirNT fiftfAStu OF CELE ASE l AMOUNT OF ACTMTY LOCATION OF AELEASE W
d N/A l
l N/A l
1P
/ U D
10 11 44 45 60 PENS 0,NNEL EXPOSURES NUMBER TYPF DESCAIPTOrd 8 1010101 L:J l
N/A i
l '
/ 00 11 1P 13 GO PERSONNEL INJUHTES NUMiti n DESCIUPT ON
] l0l0l0l l
N/A l
/ 09 11 12 00 1
Of tulle CONSI OULNCf G
@l N/A l
/ 0D 00 LOSS On OAMAGE TO FACILnY tveE ot sCimlCN 8 LzJ l
N/A
_l
/O9 10 1
PUBLICITY 3l N/A l
/ 0D 00 OITIONAL FACTORS 8002280 2 O See at tached StipplciTntary Information
.J DT L'u
.m [
(LD niONe_ m su-4m 2,_z_s.temr t NAun
\\
)
SUPPLEMENTARY INFORMATION
%J 1.
Report No:
50-302/77-44 2.
Facility:
Crystal River Unit #3 3.
Report Date:
18 May 1977 4.
Occurrence Date:
27 April 1977 5.
Identification of occurrence:
Regulating rod insertion limits exceeded contrary to Technical Speci-fication 3.1.3.6.
6.
Conditions Prior to Occurrence:
Mode 1 power operation. Power reduced to approximately 2108 MWT in order to place Group 7 regulating rods in ful1 insertion during per-3 formance of Reactor Protective System Functional Test (SP-110).
f 7.
Description of Occurrence:
At 1950 on 27 Apr111977 during the performance of SP-110, Group 6 regulating control rods moved out exceeding insertion limits by 5%.
The Group was adjusted to within limits by 2002, an elapsed time of U
12 minutes.
8.
Designation of Apparent Cause of Occurrence:
Because of previous experience of Group 7 dropping into core (See LER-77-43), power was run back to allow full insertion of that group during performance of SP-110.
Subsequent xenon buildup caused Group 6 to withdraw but, because of sequence override, Group 7. remained fully in-serted.
Operator failed to observe that rod index limits were exceeded.
9.
Analysis of Occurrence:
There were no safety implications with this occurrence.
10.
Corrective Action:
Operations personnel have been instructed to monitor the rod index limits more closely, 11.
Failure Data:
This was the first occurrence of this type.