RO-77-46:on 770514,hydraulic Snubber MUH-44 Found Inoperable.Caused by Missing Cotter pin.MUH-44 Renewed W/ Functionally Tested Spare Snubber & SP-201 Revealed Other Snubbers Operable
ML19308D379
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 06/03/1977
From: Stewart W
FLORIDA POWER CORP.
To:
Shared Package
ML19308D371 List:
References
NUDOCS 8002270830
Download: ML19308D379 (2)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

  1. N-O LICENSEE EVEN f RI-F lT I.

)4 CONTROL etOCx:1 l

l.I l

I

[PLEASE PRINT AU. REQUIRED INFORT.1 AT:CL

/

\\

1 6

N_/

NAME LCENSE NUMOEA TYPE

{ l Fl Ll Cl Rl Pl 3l l0l0l-l0l0l0l0l0l_l0l0l4j lj 1l1l1l1l l0l3l 7 09 14 13 25 2ti 30 31 32

" rN sY$

CAftConY uoCRET NUMOEA EVENT CATE AEPCnr care h CON'T l _ l _ l QJ l1l l 0l 5l 0l-l 0l 3l 0l 2l (0 l5 l 1l 4l 7l 7l l0l6l0j3l7l7 7 u 57' bu bil 60 b) 66 69 74 7b u

EVENT OtSCnt!

l La flode 5,'il0N Cold Shutdown, in the process of performing the llydraulic Snubber Inspection g

7 09 l SP-201, liydraulic Snubber MUH-44, located on 2-1/2" H.P.

injection line in the Reactor 03 7 89 3-g l Bldg., was discovered inoperable contrary to Technical specification 3.7.9.1.

7 89 a

Q l Redundancy N/A.

First occurrence of this type.

MUH-44wasrenewedwithafunctionally'\\

7 u9 et !

O5 l tested spare and restored operabia within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.

(LER 77-46) l 7 8,9 Paua 6'

SYSitM CAUSE COMRJNENT COMPONENT C00E CCCE COMPONENT Co0E SUP8UEA MANuFaCTuf4A VOLATCN japj l W l C l l Fl l H j Al Nl Cl El Rl l Al lPj3l1l ]

lNl 7 89 10 11 12 17 43 44 47 48 q

CAUSE DESCRIPTION O

q l The cotter pin that connects the snubber eye to the pipe clamp was missing due to j

7 09 00 l conditions unknown at this time.

l 09 SG I

I 89 FACAi1Y METHCo CF status

% POWEA OTHER STATUS DISCOVERY DISCOVERY DESCA#TCN lC l l 0l 0l 0l l N/A l

lB l l

N/A l

1 7 0 9

10 12 13 44 45 46 80 ACTm TY CosfENT AELEASEO oFAELEASEl AMOUNT OF ACTMTV LCCATCN OF AELEASE b

N/A l

l N/A l

d I

7 8 9

10 11 44 45 80 PERSGNNEL EXPOSURES NUM8EA fvpt OESCR@ TON 113 l 0l 0l 0l lZl l

N/A

[

7 89 11 12 13 60 PERSONNEL INJURIES NuMOER DESCMGTON DE l 0l 0l 0l l

N/A l

7 89 11 12 60 OFFSITE CONSEQUENCES 3

l N/A l

7 09 00 LOSS OR OAMAGE TO FAC:UTY k, f twE cEsCn PrCN Ql N/A 1

1 7 89 10

/

)'

W PusuCITY N/A Q'

l A O rr

.l 17 7 00 L"I AOCITIONAL FACTORS g l See attached supplementary information

,, l 7 00

'u

--/'

W. P. Stewart

,0 (811) 866-4159

.*r_

\\^

SUPPLEMENTARY INFORMATION

\\

ss_s 1.

Report No.:

50-302/77-46 2.

Facility:

Crystal River Unit #3 3.

Report Date:

3 June 1977 4.

Occurrence Date:

14 May 1977 5.

Identification of occurrence:

Hydraulic Snubber MUH-44 inoperable contrary to Table 3.7-3 of Technical Specification 3. 7.9.1.

6.

Conditions Prior to Occurrence:

In Mode 5, Cold Shutdown, performing SP-201.

7.

Description of Occurrence:

o At 1400, in the process of performing the Hydraulic Snubber Inspection SP-201, Snubber MUC-44, located on the 2-1/2" H.P. injection line in the Reactor Building, was discovered disconnected from the snubber eye to the pipe clamp. The snubber ss removed and renewed with a functionally tested spare. MUH-44 was restored operable within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.

8.

Designation of Apparent Cause of Occurrence:

The cocter pin that connects the snubber eye to the pipe clamp was missing. The reason for the missing cotter pin is unknown at this time.

4 9.

Analysis' of Occurrence:

There were no safety implications to the plant or public other than the loss of pipe restraint capabilities of MUH-44.

10.

Corrective Action:

MUH-44 was renewed with a functionally tested spara snubber and SP-201 revealed other _ snubbers operable.

i 11.

Failure Data:

This was the first occurrence of this type.

4 d