ML19308D348

From kanterella
Jump to navigation Jump to search
Forwards RO-77-26
Date released: 11/18/2019 Download: ML19308D348


RO-77-26:on 770322,makeup Valve Failed to Open on Manual Hpis Initiation,Contrary to Tech Spec Requirement.Caused by Torque Switch Set Too Low for Consistent Opening of Valve. Torque Switch Reset to Higher Valve
ML19308D354
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/12/1977
From: Stewart W
FLORIDA POWER CORP.
To:
References
Download: ML19308D354 (2)
Forwards RO-77-26
ML19308D347
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/12/1977
From: Stewart W
FLORIDA POWER CORP.
To: MOSELEY N C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
Download: ML19308D347 (1)