Forwards IE Insp Rept 50-302/76-18 on 761005-08.No Noncompliance Noted
ML19308D344
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/03/1976
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Rodgers J
FLORIDA POWER CORP.
Shared Package
ML19308D345 List:
References
NUDOCS 8002270801
Download: ML19308D344 (2)


See also: IR 05000302/1976018

Text

..

"

_.

ga ptcu

UNITED STATES

.

,

(") ,-

  • [(

,o,,

NUCLEAR REGULATORY COMMISSION

/

T

,

o

REGloN il

3

$

230 PEACHTHEE STREET, N.W. SUITE 818

9

o,

ATLANTA, GEORGIA 30303

'

gg

"%.....+

NOV

3 1976

In Reply Refer To:

IE:II:FJ

50-302/76-18

'

Florida Power Corporation

.

Attn:

Mr. J. T. Rodgers

Assistant Vice President

Quality and Environmental Departments

3201 34th Street, South

-

P. O. Box 14042

St. Petersburg, Florida

33733

Gentlemen:

This refers to the inspection conducted by Mr. Frank Jape of this office

on October 5-8, 1976, of activities authorized by NRC Construction

Permit No. CPPR-51 for the Crystal River 3 facility, and to the discussion

of our findings held with Mr. J. Alberdi at the conclusion of the inspection.

O)

(V

Areas examined during the inspection and our findings are discessed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews

with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have also examined actions you have taken with regard to previously

identified enforcement matters and unresolved items.

The status of these

items is identified in Sections II and IV of the summary of the enclosed

report.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter

and the encle eed inspection report will be placed in the ERC's Public

Document Root

If this report contains any information that you believe

to be proprii ary, it is necessary that you submit a written application

to this offic e requesting that such information be withheld from public

disclosure.

If no proprietary information is identified, a written

statement to tha.t effect should be submitted.

If an application is

submitted, it must fully identify the bases for which information is

claimed to be proorietary.

The application should be prepared so that

information sought to be withheld is incorporated in a separate paper

and referenced in the application since the application will be place

,

i

%00.227070fI

v

.

_

-

- . .

.

...

-

--

. ..

.

.

~%

-1

N01/

3 1976

,

.

.

.

'

Florida Power Corporation

-2-

_

in the Public Document Room. Your application, or written statement,

should be submitted to us 'sithin 20 days.

If we are not contacted as

specified, the enclos'ed report and this letter may then be placed in

the Public Document Room.

.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

-

Very truly yours,

(~

$\\/

%

F. J. Long, Chief

Reactor Operations and

Nuclear Support Branch

Enclosure:

IE Inspection Report No.

50-302/76-18

cc:

Florida Power Corp.

G. P. Beatty, Jr.

P. O. Box 1228

Crystal River, Fla.

32629

V

. _ -

-

_

_

. . .

___

. - - .

. . . . _ - , . -

- . - - - .