ML19308D318
| ML19308D318 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 12/01/1976 |
| From: | Long F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Rodgers J FLORIDA POWER CORP. |
| Shared Package | |
| ML19308D314 | List: |
| References | |
| NUDOCS 8002270760 | |
| Download: ML19308D318 (2) | |
See also: IR 05000302/1976020
Text
,4
pa Mov,
'N
UNITED STATES
y
o,,
NUCt. EAR REGULATORY COMMISSION
y
w
g
REGION Il
- p.g-
gc
230 PEACHTREE STR EET, N.W. SUITE 818
-
.y
,y
g * vji
,
- .*
1 1976
In Reply Refer To:
IE:II:FJ
E
50-302/76-20
Florida Power Corporation
Attn:
Mr. J. T. Rodgers
Assistant Vice President
Quality and Environmental Departments
3201 34th Street, South
P. O. Box 14042
St. Petersburg, Florida
33733
Gentlemen:
This refers to the inspection conducted by Mr. Frank Jape of this office
on October 19-22, 1976, of activities authorized by NRC Construction
Permit No. CPPR-51 for the Crystal River 3 facility, and to the discussion
of our findings held with Mr. J. Alberdi at the conclusion of the inspect-
ion.
U
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examination of procedures and representative
records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were
disclosed.
We have examined actions you have taken with regard to previously
reported unresolved items. These are identified in Section IV of the
summary of the enclosed report.
One new unresolved item results from this inspection and is identified
in Section III of the summary of the enclosed report. This item will be
examined on subsequent inspections.
During this inspection it was found that one of your activities appeared
to deviate from. accepted industry practices as stated in National Bureau
of Standards Handbook 92.
This item and reference to the specific
commitment are listed in Section VI of the summary of the enclosed
report. In your reply please include your comments concerning this
item, a description of any steps that have been or will be taken to
i
1
O
8002 270 lbO
==
.-e.-
.-.
e.
.y
.
.-m-r
- -
~
e
'
.
--~
< me
,
,
,
Florida Power Corporation
-2-
_
.
prevent recurrence, and the date all corrective actions or preventative
measures were or will be completed.
In accordance with Section 2.790 of the NRC's " Rules of Pr.actice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public
Document Room. If this report contains any information that you believe
to be proprietary, it is necessary that you submit a written application
to this office requesting that such information be withheld from public
disclosure. If no proprietary information is identified, a written
statement to that effect should be submitted. If an application is
submitted, it must fully identify the bases for which information is
claimed to be proprietary. The application should be prepared so that
information sought to be withheld is incorporated in a separate paper
,
and referenced in the application since the application will be placed
in the Public Document Room. Your application, or written statement,
should be submitted to us within 20 days. If we are not contacted as
specified, the enclosed report and this letter may then be placed in
the Public Document Room.
Should you have any questions concerning this letter, we will be glad
to discuss them with you.
Very truly yours,
,,- l
sy &
C
./
- c
F. J. Long, Chief
Reactor Operations and Nuclear
Support Branch
Enclosure:
_
IE Inspection Report No.