ML19308D306
| ML19308D306 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 11/30/1976 |
| From: | Long F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Rodgers J FLORIDA POWER CORP. |
| Shared Package | |
| ML19308D307 | List: |
| References | |
| NUDOCS 8002270751 | |
| Download: ML19308D306 (2) | |
See also: IR 05000302/1976021
Text
..
.
- -
.pnAC%
UNITED STATES
.
. ..
[
o
~
"'ICLEAR REGULATORY COMMISSIC"
g
x
(m)
g
r
230 PEACHTREE STR EET, N.W. SUITE 018
g
g
REGION il
s
'
8
o\\P
.o#
NOV 3 019/6
-
ATLANTA, GEORGIA 30303
- *
Ig y,tLE(X)P T
.
In Reply Refer To:
IE:II:FJ
50-302/76-21
.
Florida Power Corporation
Atta:
Mr. J. T. Rodgers
Assistant Vice President
Quality and Environmental Departments
3201 34th Street, South
P. O. Box 14042
St. Petersburg, Florida
33733
Gentlemen:
This refers to the inspection conducteil by W. B. Swan of this office
on October 31 - November 2, 1976, of activities authorized by NRC
-
Construction Permit No. CPPR-51 for the Crystal River 3 facility,
and to the discussion of our findings held with J. C. Hobbs, Jr. at
the conclusion of the inspection.
)
Areas examined during the inspection and our findings are discussed
in the enclosed inspection report.
Within these areas, the inspection
consisted of selective examination of procedures and representative
records, interviews with personnel, and observations by the inspector.
WiMn the scope d this inspection, no items of noncompliance were
-
disclosed.
-
-
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter
and the enclosed inspection report will be placed in the NRC's Public
Document Room.
If this report contains any information that you believe
to be proprietary, it is necessary that you submit a written application
to this office requesting that such information be withheld from public
disclosure.
If no proprietary information is identified, a written
statement to that effect should be submitted.
If an application is
submitted, it must fully identify the bases for which information is
claimed to be proprietary. The application should be prepared so that
information sought to be withheld is incorporated in a separate paper
and referenced in the application since the. application will be placed
in the Public Document Room. Your application, or written statement,
should be submitted to us within 20 days.
If we are not contacted as
,
specified, the enclosed report and this letter may then be placed in
the Public Document Room.
1
po 02 2b
,
-
.. . --. .. . . . _. .
, , ,
--+-s
"
_ _ _ _ .
_
_ _ _
- _ _ _ _
d
.
.
_
._-
--
-.
liOV 3 01976
.
. . .
.
.
3,
m
.
.
'
/
Florida Power Corporation
-2-
.
Should you hav.o any questions concerning this letter, we will be glad to
discuss them with you.
Very truly yours,
.- 9
,
Srds f~ s)f c':c.'f
-7
y
-
, I /F. J. Long, Chief
.
[C ' Reactor Operations and Nuclear
Support Branch
Enclosure:
IE Inspection Report No.
50-302/76-21
)
,
cc: Florida Power Corporation
G. P. Beatty, Jr.
P. O. Box 1228
Crystal Rivers, Florida 32629
.
l
.
1
<
a
- e,eee se
em o aosa see . - em ee se
7
^~ ====
- -. ,-
cm
w-
- . --w
,
e--,---,
- - , . -
-.,
,
-
,.
."-7
r-
"*
T
-
'-~-T
" " ' " " - ' ' - - " " ' * ~
"W7T'"
t- - - - -r