ML19308D280
| ML19308D280 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 07/07/1977 |
| From: | Stewart W FLORIDA POWER CORP. |
| To: | |
| Shared Package | |
| ML19308D102 | List: |
| References | |
| NUDOCS 8002270726 | |
| Download: ML19308D280 (2) | |
Text
. _ - - -....
L.L.,Lt w L L Lv LIV i i its L ' *I
- q
,{
C' cot'4TilOL Ot 0Cl":(l l
l l
l l
[esttAuc PntrJT ALL sitoutnto lNrc;t.'.1 AT:e:.
I 1
6 i
UCfN'Jit LC[NSC (VENI NAM [
(CCNSC NUMuin IVf4 IYPC
[F l r, l c l 1:l l' lj l 0 l 0-l-l 0l 0l 0l.0l 0l-l 0l 0l l 4l 1l 1l 1l1] d _]
7 UU 14 15 2b 20 30 31 32 tN sN0t cAttcony OoCxCT Nuuctn tytNT DATE REPont DAtt QCctri l.- l - l L,j W l0l5l0l-l0l3l0l2j l0 l6 l1 l5 l 7l 7l l 0 l 7 l0 l7 l 7l 7 7 0 h7 Ltl LU 00 ut 60 UU 74 7b ti EVENT DLSCRIPT:ON HB l In Mode 1 operation AHF-6A failed to start rendering containment H.,
purge system 7 uu p.
@l inoperable contrary co Technieal Specification 3.6.4. 2.
Redundancy maintained by 7 il 9 IU
@l AHF-68.
First occurrence. AHF-6B employed as necessary until AHF-6A returned to 7 ti u 1:6 El operability.
l 7 11 u
@l Ut J
7 U9 sysnu cAust couS!tur (LER-77-63) courencnt cout CODE COMPONFNT COOg
$UPPUD4 MANUFACIUnEH VOLA 10N o
lAlAl d l Cl Kl Tl Bl Rl Kl W
l A l1 l 6l 0l lN l 7 u0 10 11 tc 17 da 44 47 du CAUSE DESCn!PilON
- 'f 0
l loose connection on thermal overload heater prevented fan operation. Connection l
7 n9 oce l
tightened and' fan returned to service after operat'ional check.
l u
7 9
(10 1
F ACan y METHOO OF status
% POWin OTHER STAluS OtSCOvinY OISCOvinY OCSCHtPTCN d
l1l0 l0 l l NA l d l
NA l
1
/0 D
10 12'13 44 4b 4G C0 WOnM OF fille ED 0 :ll SE AMOUNT OF ACIMTY LOCA1CN OF RELCASE y
Wl NA l
l NA l
1 7 U D
10 11 44 43 PLitSONNEL EXPOSURES 00 NUMU(31 TYPE D(SCnaPTCfJ
$ l Ol 0l0 l Wl NA
.__l
/
U.D 11 12 13 60 PEnSONNEL INJUf tlES Nuuoan otten. Pron 810l 0l01 l
NA l
/ 00 11 12 i
00 i
OrFSafE Cof4SEOUCNCES BI
.NA l
- ou LDSS On DAMAGE TO FACILITY (10 i
l TYl*
GD 10 t,0 1410LICITY 33 I NA
.l uu vlt B,,_)DillONAL FACTORS See at tarlieel Siipplewnt.;try In fortnat inn 8002270 l--
7 tna EI I
e si._r.,_.s.ti w n _ [.U M
_ _ _...._..,.noN,: o n m - e.w Naui-
_.. _ ~
0\\,
$UPPLEMEffrARY INFORMATION 4
1.
Report No. :
50-30L. 1-63 2.
Facility:
Crystal River Unit #3 3.
Report Date:
7 July 1977 4
Occurrence Date:
15 June 1977 5.
Identification of Occurrence:
Failure of AHF-6A to start rendering the containment hydrogen purge system inoperable contrary to Technical Specification 3.6.4.2.
6.
Conditions Prior to Occurrence:
Normal Mode 1 power operation.
7.
Description of Occurrence:
At 1300, in the process of purging the Reactor Building, the Reactor Building cooling fan AHF-6A could not be started from the Control Room.
Investigation revealed loose ' lectrical connector on thermal overload heater. After tighten-e ing connection and operational check, fan was returned to service.
s 8.
Designation of Apparent Cause:
Loose electrical connection.
9.
Analysis of Occurrence:
The safety to the plant and general public was not affected as redundant Reactor Building cooling fan AHF-6E was operable and available.
10.
Corrective Action:
None required as this was.an isolated event.
11.
Failure Data:
This is the first occurrence of this event.