ML19308D272
| ML19308D272 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 12/29/1976 |
| From: | Long F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Stewart W FLORIDA POWER CORP. |
| Shared Package | |
| ML19308D268 | List: |
| References | |
| NUDOCS 8002270719 | |
| Download: ML19308D272 (2) | |
See also: IR 05000302/1976024
Text
v
,
f "'%
U:3TO STATES
-
.w
4'
%,
.MUCt. EAR REGULATORY COMMISSION
REGION 11
".J
/
}*
.~
230 PEACHTREE STR EET. N.W. SutTE 818
Jg
(
/
ECOPy
\\ y,,. **[
ATLANTA, GEORGIA 3o3o3
b'
0,,
DEC.2 91976
-
In Reply Refer To:
IE:II:FJ
50-302/76-24
.
.
Florida Power Corporation
i
Atta:
Mr. W. T. Stewart
I
Director of Power Production
l
3201 34th Street, South
!
P. O. Box 14042
l
St. Petersburg, Florida
33733
Gentlemen:
This refers to the inspection conducted by Mr. Frank Jape and other
of this office on December 4-9, 1976, of activities authorized by NRC
License No. DPR-72 for the Crystal River 3 facility, and to the discus ~
-
sion of our findings held with Mr. G. P. Beatty, Jr. at the conclusion
of the inspection.
Areas examined during the inspection and our findings are discussed in
3
Q
the enclosed inspection report. Within these areas, the inspection
consisted of selective examination of procedures and representative
.
records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were
~
'
i
disclosed.
We have examined actions you have taken with regard to previously
)
reported unresolved items.
these are identified in Section IV of the
,
'
i
stpmary of the enclosed report.
.
l
Two new unresolved items resulted from this inspection and are identi-
j
fied in Section III of the summary of the enclosed report. These items
j
i
will be eynmined during subsequent inspections.
l
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
l
Part 2, Title 10, Code of Federal Regulations, a copy of this letter
]
and the enclosed inspection report will be placed in the NRC's Public
l
j
If this report contains any information that you believe
j
-
Document Room.
l
to be proprietary, it is necessary that you submit a written application
to this office requesting that such information be withheld from public
,
-
disclosure. If no proprietary informati6n is identified, a written
j
.
P
.
nf
A
~ :..
-
1
G}
.
8002 27o pg
\\
i
,
l
--
==g-
- - -
--
.-n
. , -_
.g_,,
_
l
-
t
'
-
v
.
e ,
,- ----
--
-
-
ut.t,4 o
w'*
I
.
.
.
.
l'
Florida Power Corporation
-2-
w/
~
.
statement to that effect should be submitted. If ar. spp11 cation is
,
submitted, it must fully identify the bases for which information la
i
claimed to be proprietary. The application should be prepared so that
inforniation sought to be withheld is incorporated in a separate paper
and referenced in the application since the applicatiot. will be placed
in the Public Document Room. Your r; '?1 cation, or written statement,
should be submitted to us within 20 aufs.
If we are not contacted as
j
specified, the enclosed report and this letter may then be placed in
the Public Document Room.
i
j
Should you have any questions concerning this letter, we vill be glad
to discuss them with you.
3
Very truly yours,
-
,
p,.r,0 ~
.%
p F. J. Long, Chief
Reactor Operations and Nuclear
Support Branch
Enclosure:
IE Inspection Report No.
50-302/76-24
cc: Florida Power Corporation
. .
.
G. P. Beatty, Jr.
P. O. Box 1228
Crystal River, Florida 32629
I
!
.
!
!
o
\\
.
.
.
.
.. ... .. ..
_ . - ,
,
.