Addl Response to NRC Re Violations Noted in IE Insp Rept 50-302/77-05.Power Ascension Test Procedure Reviewed & Safety Analysis Performed.Deletion of Test at 15% Power Did Not Constitute Unreviewed Safety Question
ML19308D147
Person / Time
Site: Crystal River 
Issue date: 05/31/1977
From: Stewart W
FLORIDA POWER CORP.
To: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19308D141 List:
References
CS-77-96, NUDOCS 8002270625
Download: ML19308D147 (1)


Text

. _.,,...

A***)l, a[h y.

I 34e i

gg 31 May 1977 3-0-3-a-2 co uo u rio.

CS-77-96 Mr. Norman C. Moseley, Director Office of Inspection and Enforcement Docket No. 50-302 U. S. Nuclear Regulatory Commission License #Dr*R-72 Raf: IE:II:FJ 230 Peachtree St., N.W., Suite 818 Atlanta, Georgia 30303 50-302/77-5

Dear Mr. Moseley:

We offer the following amplification of our response, dated 25 April 1977, to the Infraction cfted in the referenced Inspection Report

" Infraction - Change to Test Program Commitment Contrary to the requirements of 10 CFR 50.59(b), a writ-ten safety evaluation was not performed to determine that the unreviewed safety question did not exist when the reactivity coefficients at power test was deleted from the 15 percent power ascension test program.

of the FSAR states that this taat will be performed at Table 13-4 incremental power levels."

Subsequent to our discussions surrounding this issue, Committee review of the test procedure has been performed including a the Plant Review safety analysis in accordance with the requirements of 10 CFR 50.59(b)

This evaluation determined that the deletion of the test at 15 percent power did not constitute an unreviewed safety question.

The development, were under the aegis of the test program. review, and performance of the test proc thereto receive a documented safety evaluation which reflects thPlant procedures a requirements of 10 CFR 50.59(b), therefore, this apparent lapse will not e specific recur.

discuss them w1th you.Should you have any questions concerning this issue, we o

Very truly yours, FLORIDA POWER CORPORATION t

0 DALha-A h s

}

DWP/feh

/

W. P. Stewart V

A Director, Power Production g

Nuclear Plant Manager 8002270 s

General Office 32ai htyeurm street soum. p o. sex $4o42. st. Petersouro. Fionca 33