RO-77-62:on 770630,eight Hr Time Limit for Reduction to Less than 60% Thermal Power Exceeded.Caused by Personnel Error. Personnel Instructed to Heed Time Limits More Conservatively
ML19308D146
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 07/07/1977
From: Stewart W
FLORIDA POWER CORP.
To:
Shared Package
ML19308D108 List:
References
NUDOCS 8002270624
Download: ML19308D146 (2)


Text

_ _ _ _ _ _

W

=

-.m......_._

._s.....

... v...

y-CONinOL Ot.OCK;,

l l

l l

l l

(ptcASc psalNT ALL 11CoutaCU IrJs Cat.1A1:c.

1 6

if I

'N

/

A t (CtNSC Nuuutn E

175 (I'u)9lF lLlCl Rl Pl 3ll 0 l 0-l-l 0l 0l 0l 0l 0l-l 0l Oj l 4l 1l 1l 1l1l l0l1l

~75 2G.

30 31 32 14 15 P

17e[ $ Eict cAircony DECKET NUMotit tytNT DATE ACPOnt Daft E] CONT l-I- l LT_J Lt._J

!a l s 101-101310l21 l 016 l 31017 I 71

[ 0 l 710 ! 7 I 717

'/ 18 L7 LU LD 00 61 G8 09 74 73 ti EVENT O!:SCTcI'llON l3t-) l In Modo 1, reducing power to less than 607, thermal power, as required by Technical f uu il

@l Specification Action Statement 3.1.3.3.A.1, the 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> time limit was exceeded by 7 il 9 Eh hl one hour and seven minute s.

Redundancy NA.

First time occurrence.

Personnel were 7 nu er

$l instructed to take necessary steps to insure that required time limits are met.

7

  • 3 u g;

O',

$$snu cAust cou"U!tur (LER 77_62) coucoucul COOL CODE COMPONENT CODE Su m (H MAra.tAClui(A vcLAloN

{Z lZ l lAj l Zl Z lZ l Z l Z l Z' ]

y l 2 l 9 l9 l9 l W

o 7 18 0 10 11 12 17 43 44 47 au CAUSE DESCIUPilON

  • *8; f.

bl The event was the result of operator failure to stare power reduction in time to j

hl satisfy the allowed time frame as set forth by Technical Specifications.

j 00 61 (10

.I FAcan y METHoo OF STATUS

% POWtn OTHtn STATUS DaScovinY DISCOVERY OCSCRIPTON W

l 0l 5l 8l l

' NA l d l Review of Operators' Log l

/0 9

10 12 -13 44 45 40 CO ACTMff COflTENT f4(LEAstt3 OF 6:ttt ASE l (Z_j '

AM0uNT OF ACTMTV h

d LOCAIGN OF RCLEASC NA l

l NA l

7 U 9

10 11 44 45 PERSONNEL EXPOSunES 00 NUMOf f t TYPE DISCnPTON

[TE 1010101 l zl I

NA l

/ 09 11 12 13 60 PERSONNEL INJtif ties NUMDin DCCCHtPTON

@ l0l0 j 0l l

NA l

/ 0u 11 12 00 OFFSITE CONSEQUENCES E@ l NA 00 l

UU LOSS OR DAMAGE TO FAC! LIT,Y 1YI Ot CC84ar*iCN M l [t l

NA l

0D 10 I,0 PUBLIC11Y Bl NA

'l

  • tl D i:u

)

ADOll!ONAL i ACTORS

?

See attached Sup2 cnentary In formation 1

, _,,; h jpjl 8 0 02 270 Of

,,, c nu 1

NAMt :

2.M a.P

.G C P3U1II._.. __.___.

I q tot :( - (IIl "O PP /> ;/; 1 'e9 s

O em

~-

SUPPLEMEffrARY INFORMATION J

1.

Report No.:

50-302/77-62 2.

Facility:

Crystal River Unit #3 3.

Report Date:

7 July 1977 4.

Occurrence Date:

30 June 1977 5.

Identification of Occurrence:

Exceeded the 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> time limit for reduction to less than / % thermal power as required by Technical Specification Action Statement 3.1.3.3. A.1.

6.

Conditions Prior to Occurrence:

Verifying the position of Rod 3, Group 6 as required by Technical Specification f-3.1.3.3, upon loss of the absolute position indication.

7.

Description of Occurrence:

As a result of loss of absolute position indication of Control Rod 3, Group 6, power reduction to less than 60% thermal power was required to be achieved within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> by Technical Specification Action Statement 3.1.3.3.A.1.

Be-cause of several minor difficulties af ter the initiation of power reduction, the 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> time limit was exceeded by I hour and 7 minutes. At that time (0600),

the Action Statement was met except for the time interval. Conditions surround-ing absolute position indication failure will be reported as a 30 day written report prior to 30 July 1977.

8.

Designation of Apparent Cause:

This event was a result of operator failure to anticipate the potential for equipment problems which retarded power reduction to less than 60% in the re-quired time frame.

9.

Analysis of Occurrence:

There was no safety related significance to this event.

~

10.

Corrective Action:

Operations personnel were instructed to heed Technical Specification requirements as to time frame limits more conservatively and take necessary steps to insure these time limits are met.

L 11.

Failure D'aca:

A c

)

This event was non-repetitive.