RO-77-53:on 770529,chemical Addition Pumps 3A & 3B Inoperable.Cause Unknown.Evaluation of Event Requested
ML19308D130
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 06/20/1977
From: Stewart W
FLORIDA POWER CORP.
To:
Shared Package
ML19308D119 List:
References
NUDOCS 8002270611
Download: ML19308D130 (2)


Text

m.-.._-

CONTAOL ULOCK.

l l

l l

l (PLEASE P AINT ALL REQUIAEC INFC A.*.1?.T.Cl.

l 1

6 N

- LCENSEE LCENSE EVENT f'

i NAME LCENSE NUMBEA TYPE Type

( jj [ F l L l C l R l P l 3 l l0l0l-l0l0l0l0l0l-l0l0l l 4l 1 l1-l1 l1 l l0 l 3l IB9 14 15 25 26 30 31 32 77PU NN coCxf7 NuM0ta EVEM TE AEPORT CATE CAftCCav O 1 CON'T ! -l -l lL l lL l l 0 l 5 l 0 l-l 0 l 3 l 0 l 2 l l0 l5 Il lo !7 l7 l l O! 6l ?! 0l 7l 7' 7

8' 57 LO 59 60 61 68 69 74 75 GL EVENT DESCniPTION a

l In mode 3 (hot standby) preparing for plant startup, both chemical addition pumps

.p 7 89 h

C3 l CAP-3A & 3B were found to be inoperable contrary to Technical Specification 3.1.2.2.

J 7 09 S.

M l N dundancy was maintained with the low pressure injection system.

Event was not i

7 83 Eu

@l repetitive. Both pumos were flushed with demin watar and restored operable within 7 09 go Q] two (2) hours.

7 89 ge

%g (LER 77-53; E

CCCE COMPCNENT COCE S

R M

C W TCN O

l Rl Bl {

l Pl Ul Ml Pl Xl.]

lN l lC l 3l 0l 0l

[Nl 7 89 10 11 12 17 43 44 47 48 CAUSE DESCA:PTJON 9

grj l The cause of this event has not been determined.

It has not reo ccurred. Corrective

]"

7 89 GO gl Action will be taken pending the results of an engineering evaluation now in progress.

7 85 BC

  1. 1 I

Facufy METHCO OF STATUS

% POWER oTHER STATUS 0.SCavERY QSCOVEAY DESCA'"TCN lCl l 4 4 0l l NA l

lAl l.

NA J

1 7 0 9

10 12 13 44 45 46 60 FCAM CF AMOUNT OF ACTMTV LOCATCN CF AELEASE RELE SEO OF ASE l l

l

.NA l

12 NA 7 8 9

10 11 44 45 60 PEnnN'JEL EXPOSURES NUMBEA TYPE CESCM' TION Ql0l0l Wl NA j

13 7 89 11 12 13 GC PERSONNEL INJUDICS NUMBER CESCAipflGN l 0l 0 l 0 l l

NA l

14 7 89 11 12 et OFFSITE CONSEQUENCES M l NA l

7 89 OU LOSS OR CAMAGE TO FACILITY TYPE CESCA:PficN l

dl 16 NA l

7 89 10 1,L PUBLICITY NA l

1 7 89 6.

l ACOITIONAL FACTCAS

[

]l See attached Suonlemene m In fore en

(

,09

$l 8002270 (//

7 89

,, f in.

N. P. Stewart

(,,,th (813) 866-4159 NAME:

PHONE:

w;/

un m.sei

SUPPLEMENTARY INFORMATION (V' -

)

l.

Report Nc.

50-302/77-53 2.

Facility:

Crystal River Unit #3 3: Report Date:

20, June 1977 4.

Occurrence Date: 29 May 1977 5.

Identification of occurrence:

Chemica1' addition pumps CAP-3A & 3B inoparable contrary to Technical Specification 3.1.2.2.

6.

Conditions Prior to Occurrence:

The plant was preparing to achieve' criticality by adjusting boron for the accept-able critical rod position..

7.

Description of Occurrence:

l At 0700 in preparation for criticality, an attempt to adjust Reactor Coolant boron f-concentration for acceptable critical rod position revealed that r.either chemical addition pump CAP-3A or CAP-3B would deliver boric acid to the makeup tank. -Both chemical addition pumps were flushed with demineralized water and the pumps restored operable within two (2) hours. Startup resumed without incident.

8.

Designatio'n of Apparent Cause:

The cause of P.his event has not been determined as of this' date, as the event has not reoccurred.

9.

Analysis of occurrence:

This event had no safety implications as the high pressure injection pumps and the bor9ted water storage tank were available and operable.

10.

Corrective Action:

An evaluation of this occurrence has been requested and corrective action will be taken pending results of the evaluation.

11.

Failure Data:

This was not a repetitive occurrence.