ML19308D103
| ML19308D103 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 01/24/1977 |
| From: | Stewart W FLORIDA POWER CORP. |
| To: | Moseley N NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| Shared Package | |
| ML19308D104 | List: |
| References | |
| CS-77-11, NUDOCS 8002270595 | |
| Download: ML19308D103 (1) | |
Text
-.
.., e.
- wo'N
^
4
^c.EhO E
o
\\
s
(
- C8
=
' M j*sf g IE FIIE COPY -
U e
go.
Florida 24 January 1977 i.;
~
,, m h
,(
b*
3
-3 s
'm.
Mr. Norman C. Moseley, Director Docket No. 50-302 Office of Inspection and Enforcement License #DPR-72 U. S. Nuclear Regulatory Commission Licensee Event Report 77-4 230 Peachtree St., N.W.,
Suite 818 Atlanta, Georgia 30303
Dear tir. Moseley:
This report is submitted in accordance with Technical Specification 6.9.1 and Regulatory Guide 1.16, Revision 4, Section 3.b. (3), as &
written Thirty-Day Report, During cycling demonstration of normally untestable valves, a valve
(' n) control switch was incorrectly placed in the open position permitting v'
a flow path from the Reactor Coolant System to the Reactor Building Sump. The valve was closed upon dist overy.
i corrective action as shown on the attached Licensee Event Report has be 'n completed.
Very truly yours, FLORIDA POWER CORPORATION Y
&9\\. D L L C C-k.1
\\
W. P. Stewart Director, Power Production DWP/feh Enclosure
!. ]I IQ3g g
Nuclear Plant Manager U
800227087f D
%.J General Office 3201 Thirty-fourth Street South. P O Box 14042. St. Petersburg. Fboda 33733 813-866-5151