ML19308D103

From kanterella
Jump to navigation Jump to search
Forwards RO-77-04
ML19308D103
Person / Time
Site: Crystal River 
Issue date: 01/24/1977
From: Stewart W
FLORIDA POWER CORP.
To: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML19308D104 List:
References
CS-77-11, NUDOCS 8002270595
Download: ML19308D103 (1)


Text

-.

.., e.

  1. wo'N

^

4

^c.EhO E

o

\\

s

(

- C8

=

' M j*sf g IE FIIE COPY -

U e

go.

Florida 24 January 1977 i.;

~

,, m h

,(

b*

3

-3 s

'm.

Mr. Norman C. Moseley, Director Docket No. 50-302 Office of Inspection and Enforcement License #DPR-72 U. S. Nuclear Regulatory Commission Licensee Event Report 77-4 230 Peachtree St., N.W.,

Suite 818 Atlanta, Georgia 30303

Dear tir. Moseley:

This report is submitted in accordance with Technical Specification 6.9.1 and Regulatory Guide 1.16, Revision 4, Section 3.b. (3), as &

written Thirty-Day Report, During cycling demonstration of normally untestable valves, a valve

(' n) control switch was incorrectly placed in the open position permitting v'

a flow path from the Reactor Coolant System to the Reactor Building Sump. The valve was closed upon dist overy.

i corrective action as shown on the attached Licensee Event Report has be 'n completed.

Very truly yours, FLORIDA POWER CORPORATION Y

&9\\. D L L C C-k.1

\\

W. P. Stewart Director, Power Production DWP/feh Enclosure

!. ]I IQ3g g

Nuclear Plant Manager U

800227087f D

%.J General Office 3201 Thirty-fourth Street South. P O Box 14042. St. Petersburg. Fboda 33733 813-866-5151