Forwards IE Insp Repts 50-280/79-68 & 50-281/79-87 on 791210-12.No Noncompliance Noted
ML19308C967
Person / Time
Site: Surry  Dominion icon.png
Issue date: 12/28/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Proffitt W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML19308C968 List:
References
NUDOCS 8002130020
Download: ML19308C967 (2)


See also: IR 05000280/1979068

Text

f

-72L

~

-

&#NO

f Mou

'o,'

UNITED STATES

54P/

8

NUCLEAR REGULATORY COMMISSION

n

.

$

E

REGION il

'

o

101 MARIETTA sT

N.W., SulTE '. 00

o

ATLANTA, GEORGIA 30303

DEC 2 B IO

In Reply Refer To:

RII:JDW

50-280/79-68

50-281/79-87

Virginia Electric

-d Power Company

ATTN:

W. L. Prot.m

Senior Vice President, Power

P. O. Box 26666

Richmond, VA 23261

Gentlemen:

This refers to the inspection conducted by J. D. Wilcox, Jr. of this office on

December 10-12, 1979 of activities authorized by NRC License Nos. DPR-32 and

DPR-37 for the Surry Power Station facility, and to the discussion of our

findings held with W. L. Stewart at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

.

1

1

-

8 00213 o O 'LO

1

1

t

. _ _ _ _ _ _

_-

.

Duke Power Company

-2-

DEC 2 8 E79

,

h

b

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

.

s

i

!

. E.

rphy,

ief

,

Reactor Construction and

+

Engineering Support Branch

[

Enclosure:

Inspection Report Nos. 50-280/79-68

and 50-281/79-87

cc w/ enc 1:

W. L. Stewart, Manager

P. O. Box 315

Surry, VA 23883

'

,

&

>

<