ML19308C614
| ML19308C614 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 12/12/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parker W DUKE POWER CO. |
| Shared Package | |
| ML19308C613 | List: |
| References | |
| NUDOCS 8002010007 | |
| Download: ML19308C614 (2) | |
See also: IR 05000413/1979022
Text
.
[\\
I
I
\\
Sa me;
'o
UNITED STATES
~g
8'>
NUCLEAR REGULATORY COMMISSION
n
%
$
,a
REGION 11
0
101 MARIETTA ST., N.W.. SulTE 3100
e*
ATLANTA. GEORGIA 30303
.....
DEC 1 21979
In Reply Refer To:
RII:WPA
50-413/79-22
50-414/79-22
Duke Power Company
ATTN:
W. O. Pa rker, Jr.
Vice President, Steam Production
P. O. Box 2178
Charlotte, NC 28242
Centlemen:
This refers to the inspection conducted by
W. P.
Ang of this office on
November.19-21, 1979, of activities authorized by NRC Construction Permit Nos.
CPPR-Il6 and CPPR-il7 for the Catawba Nuclear Station facility, and to the dis-
cussion of our findings held with D. G. Beam at the conclusion of the inspection.
>
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
We have examined actions you have taken with regard to previous,1y reported unre-
solved items. The status of these items is discussed in we enclosed report.
i
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public dis' closure.
Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared
so that proprietary
information identified in the application is contained in a separate part of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
.
e
M
g o o 2 0 , o O O 'j
,
- . .
.
.u.
OIC 1 P 1979
%
Duke Power Company
,,
Stould you have any questions'concerning this letter, we will be glad to discuss
them with you.
Sincerely,_
-
i
/
.n r
,/
C. E. Murphy, Chi._ f
Reactor Construction and Engineering -
Support Branch
-
Enclosure:
Inspection Report Nos. 50-413/79-22
[
-
and 50-414/79-22
cc w/ enc 1:
D. G. Beam, Project Manager
P. O. Box 223
'
Clover, SC 27910
!
r
r
,
t
E
P
i
!
i
s
,
!
.
+
?
.-
t
.
.
-
t
su
L
,
,
I
, , _
.
.
-