Public Service Company of Colorado Fort St. Vrain, Docket No. 50-267
=
ENCLOSURE 1 NOTICE OF VIOLATION g.g :.:.:
Based on the results of an NRC investigation conducted during January 23-26, 1978, it appears that certain of your activities were not conducted in full compliance with NRC requirements as indicated below.
i 1.
Technical SFacification 7.4.a and 7.4.a.5 (Procedures - Administrative t
Controls) states:
7.4.a
" Written procedures shall be established, J
implemented and maintained covering the activities referenced below:"
7.4.a.5
" Emergency Plan implementation."
~~
a.
Item II.8, Annex A, of the Fort St. Vrain Radiological
=2 Emergency Response Plan states in part, "Imediately upon the occurrence of one of the conditions requiring the imple-A mentation of this plan, the shift supervisor on duty at Fort St. Vrain facility will initiate notification procedures
=
by calling Weld County Comunications Center and the PSCO operator."
..A Contrary to the above, the initial notification on January 23, 1978, to the Weld County Communications Center and the PSCO operator were not made until approximately 25 minutes after the plant was evacuated.
This is an infraction.
b.
Item II.B.2, Annex A of the Fort St. Vrain Radiological Emergency fb Response Plan requires that the initial notification message will j.; a consist of the following:
"The category of the incident and area dffected by sector and distanCO."
h$
Contrary to the above, the initial notification on January 23,
[:
1978 did not include the category of the incident and area f =y1 affected by sector and distance.
(
This is an infraction.
_.z.= =
2.
Technical Specification LC0 4.8.1.a states:
"The release of gaseous and airborne particulate effluents shall be made on an isotopic T.[ =
basis and shall be limited in accordance with the following equation."
= ~..
(i (r) Ci I
3 x 1010 3
cm (MPC)1 sec l
8 0 01210fff;
i Ql5
(
' Where Ci is concentration in uCi/sce for any radioisotope.
=
release rate in sec/sec r =
....; g..
(MPC)i is in units of uCi/cc as defined in Column 1, Table II
=
of Appendix B to 10 CFR 20. -
== E:
Contrary to the above, the release of gaseous and airborne particulate
- =
effluents on January 23, 1978, exceeded LC0 4.8.1.a by a factor of about 3.7.
55 This is an infraction
~"' ~