ML19308B666

From kanterella
Jump to navigation Jump to search
Forwards Corrected Page 55 to Suppl to LER NP-32-77-16
ML19308B666
Person / Time
Site: Crane, Davis Besse  
Issue date: 02/03/1978
From: Murray T
TOLEDO EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
TASK-TF, TASK-TMR L78-086, L78-86, NUDOCS 8001160621
Download: ML19308B666 (2)


Text

\\

A.

g-;

--J TOLEDO ca EDEOnl February 3, 1978 L78-086 FILE:

RR 2 (NP-32-77-16)

Docket No. 50-346

- : ~[,

Cl License No. NPF-3

/

/s g& o :

lig i

Davis Gesse.

Rf Mr. James G. Keppler ggpy ft,Q,19~/7 h!: u,,* ^ b, %I g, 9 9

M Regional Director, Region III i

J }~~;

c h'M},3 (A'/j Office of Inspection and Enforcement

,yt g/

U. S. Nuclear Regulatory Commission 799 Roosevelt Road

/

Glen Ellyn, Illinois 60137 g

sN'

Dear Mr. Keppler:

Supplement to Reportable Occurrence NP-32-77-16 Correction Davis-Besse Nuclear Power Station Unit I wmwernma Enclos,ed, find, three[ corr 3cte,dicopyesjof Licensee Event Report NP-32-77-16 Supple-ment, gag (55j which supersedes the copy transmitted on November 14, 1977.

The earlier transmitted copy failed to include the Main Turbine Trip on a trip signal from either Channel 1 or Channel 2.

Yours truly, T m~ D9

/

. Terry D. Murray Station Superintendent Davis-Besse Nuclear Power Station TDM/JRL/ljk Enclosures cc:

Dr. Ernst Volgenau, Director Office of Inspection and Enforcement Encl: 40 copies Supplement Correction Mr. William G. Mcdonald, Director

-7 0N' Office of Management 7go?.9 Information and Program Control Encl: 3 copics Supplement Correction ROOAl 5 $?

  • h THE TCLEDO EDISON COMPANY ED' SON Pt AZA 300 MADISDN AVENJE TOLEDO OHIO'43G52 S0011 60 m.

o\\ 5 ENCIDSURE 2

.t

_ STEAM-FEEiniATER RUPTURE CONTROL SYSTDi ACTUATION

'?

CilAtluEL 1 I'HS 101 HS 100 MS101-l'

'llS 394 ICS !!B' FW 612' FW 780!

SP 78

,{C 5767A)

CilAtit3EL 2 NOTE 3_

NOTE 3 NOTE 3 MS 101 HS 100 MS100-1 11S 375 ICS tlA FW 601

_FW-799 SP 7A NOTE 3

(_C 5792)

NOTE 3 NOTE 3 liOTE 3 1.0W PRESSURE HAIN NCTE 3 Ste.in 1.ine 1 (<.600#)

Sl!UT Sl!UT Sl!UT SilUT SiluT S!!UT Sl!UT Sill!T SituT SilUT SilUT SilUT SilUT -

SilUT I.0W PMESSURE HAIN Stente Line 2 ((600#)

SilUT Sil0T SilUT Slitri SiluT Sllut SilUT SilUT SilUT SilUT SilUT SilUT SIIUT SituT Slit.

-FWAP SG !

lilt:ll (>177 PSID)

SilUT SilUT SilUT SilUT SilDT SilUr SilUT SituT SilUT SilUT SilUT SHUT SituT SilUT S ul. -TWoP Sc 2 lill;ll (>l?7 PSID)

SilUT SilUT SIRIT SituT SiluT SilUr SilUr SIIUT SilUT SilUT SilUT SIIUT SliUT SilUT IDW l.EVEl. SG !

(< l 7" Sun)

SilUT Sillrr SiluT SilUT SilllT Sil0T S!!UT S!!UT SIIUT S110T SilUT -

S!!UT SilUT Sintrr IDW I.EVLI. SC 2

-((17 SUR)

SilUT SilVT SituT SilDT SliUT S!!UT Sl!UT Sl!UT,,

SilUT Silui SilUT.,

SilUT SI!UT SliUT IDSS OF 4 RC PIINPS CllANilEl, I

' SP 6A (C 5762A)

HS 106 HS 106Al AF3870 AF 3869 AF 608 HAIN CilANNEl, 2 SP 6B

!!S 107 HS107A AF3872 AF3871 AF 599 MAIN (C

_ '5792)

TUllBINE I.0W PHI:SSURE !!AIN TURiiINE OPEN OPEli Sil:All 1.INE 1. (<6007)

SilUT Sl!UT SillrP NOTE 1 NOTE I SIIUT SIIUT NOTE I NOTE I SilUT SilDT OPEN TRIP OPEN OPEN IMW PRESSilRE !!AIN OPEN STEAM I.lNE 2 ((600f)

SilUT SilUT NOTE I SilUT S!!UT NOTE I NOTE I SilUT SituT NOTE 1 OPEN Sl!UT TRIP OPEN OPEN OPEN Sill-FW 4 P SC L lilCl >l77 PSIO SilVT SilUT OPEN OPEN S!!UT SiluT OPEN OPEN SilUT SilUT OPEN OPEN TRIP Sit!-FWA P Sc 2 IIIGil > 177 PSID Sl!UT SiluT OPEN OPEN SIIUT Sillrr OPEN OPEN SilUT SilUT OPEN OPEN TRIP I.0W LEVEL SG 1

((17" SilR)

SilUT SilHT OPEN UPEN S!!UT SilVT OPEN OPEN SilUT SilUT OPEN OPEN TRIP IDW l.EVtl SG 2 (O 7" SUR)

Sil0T SilUT OPI(N OPEN SilDT SilUT OPEN OPEN SilDT SilUT OPEN OPEN TRIP OPEN OPEN

!.055 0F 4 BC PUMPS NOTE 2 NOTE 2 SilUT

. StiUT OPEN OPEN SilUT SiluT OPEN OPEN TRIP 110TES:

1.

If both main steam lines aru 4600#, those valves shut.

2.

These valves are closed on a 1:Tlicae valves will not open if Dil 11 and Dil 12 (Dil Suction from RCS) are open 3.

channel trfp.

REV. 1 2/1/78

>,w

~

^