ML19308A972
| ML19308A972 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 10/26/1973 |
| From: | Thies A DUKE POWER CO. |
| To: | |
| References | |
| NUDOCS 7912120738 | |
| Download: ML19308A972 (4) | |
Text
_ -
7
~
~
AEC PSTRIBUTION FOR PART 50 DOCKET P'ERIAL (TEMPORARY FORM)
CONTROL NO:
7900 FILE:
FROM:
DATE OF DOC DATE REC'D LTR MEMO RPT OTER Duke Po'er Company w
Charlotte, N. C.
28201 A. C. Thies 10-26-73 10-30-73 X
TO:
SENT LOCAL PDR X
Mr. Giambusso 1 signed CLASS UNCLASS PROP INFO INPUT NO CIS REC'D DOCKET NO:
yXX 1
/270/287 DESCRIPTION:
ENCLOSURES:
U Ltr reporting an unusual event concerning liquid & gas waste management systems which v2re processing larger volumes of fluids j
,.5 than were estimated in Chapter 11 of the FSAR..
&,........,gj3 DO Not RGl0 PLANT NAME: Oconee Units 1, 2 & 3 FOR ACTION /INFOPJ!ATION 10-30-73 AB BUTLER (L)
- SCIL'ENCER(L)
ZID4 ANN (L)
REGAN(E)
W/ Copies W/7 Copies W/ Copies W/ Copies CLARK (L)
STOLZ(L)
DICKER (E)
W/ Copies W/ Copies W/ Copies W/ Copies GOLLER(L)
VASSALLO(L)
KNIGHION(E)
W/ Copies W/ Copies W/ Copies W/ Copies KNIEL(L)
SCHEMEL(L)
YOUNGBLOOD(E)
W/ Copics W/ Ccpics U/ Copics W/ Copics INTERNAL DISTRIBUTION m
'G FILE (3) j TECH REVIEW DENTON A/T IND
/ HENDRIE GRIMES LIC ASST BRAIIMAN
'/ OGC, ROOM P-506A SCHROEDER GAMMILL DIGGS (L)
SALIZMAN
/ MUNTZING/ STAFF
/ MACCARY KASTNER GEARIN (L)
B. HURT
/ CASE y KNIGHT BALLARD AOULBOURNE (L) pggg GIAMBUSSO fPAWLICKI SPANGLER LEE (L)
MCDONALD BOYD
/ SHA0 MAIGRET (L)
DUBE MOORE (L)(IL'R) j STELLO ENVIRO SERVICE (L)
/DEYOUNG(L)(PWR)
, HOUSTON MULLER SHEPPARD (E)
INFO SKOVHOLT (L)
NOVAK DICKER SMITH (L)
C. MILES P. COLLINS y ROSS KNIGHTON TEETS (L)
- B. KING
/IPPOLITO YOUNGBLOOD WADE (E)
REG OPR
/TEDESCO REGAN WILLIAMS (E)
/ FILE & REGION (3)
LONG PROJECT LDR WILSON (L) j
/ MORRIS LAINAS g
j ygygy gy3O STEELE j
f BENAROYA HARLESS
/ VOLI"ER 4
EXTEFl:AL DISTRIBETION Jy 1 - LOCAL PDR Walhalla. S. C.
p) 7/1 - DTIE(ABERNATHY)
(1)(2)(10)-NATIONAI LAB'S 1-PDR-SAN /LA/NY A - NSIC(2UCHANAN) 1-GERALD LELLOUCHE 1 - ASLB(YORE /SAYRE/
.1-W. PENNINGTON, Rm E-201 GT BROOKHAVEN NAT. LAB WOODARD/"H" ST.
1-CONSULTANT'S 1-AGMED(Ruth Guss=cn) vf6 - CYS ACRS 31Cgyppg SENT TO LIC ASST.
NEWMARK/BLUME/AGBABIAN Eli-B-12 7, GT.
E. GOULBOURNE l-GERALD ULRIKSON...ORNL l-RD.. MULLER..F-309 @
- ~; ;
- ,w y o
.]
g.
~
Dt:KE POWER COMPANY Powra Ben.orno 4aa Sourn Caraca Srazrr, CuAntorrr,N. C. asaos
@) !f7
.Y A. c TMits Q/
Q P. o. Box as78 senion vic P=ceiocur s/
00DFd)
/
Paoouction ano Ta4=suissio N
U!,AIC OQ L
October 26, 1973
'Y v T 3 01973 * -
m eA m ':LATCPJ s i A
pat SECTON x e P%
.We 4
000KET CLERK N
s
,e 'N Hr. Angelo Giambusso C;
~[j
~ '
Deputy Director for Reactor Projects
._y y
s h fy Directorate of Licensing s
Office of Regulation U. S. Atomic Energy Commission e
GOT3 0M Washington, D. C.
20545 g,xn rc~
4
- c. m ~
Re: Oconee Nucl - N tion D
N$. -
Docket Nos.
-270, and -287
/
p i 'y
Dear Mr. Giambusso:
Pursuant to Technical Specifications 6.2 and 1.9(b) attached to Operating Licenses DPR-38 and DPR-47, we are reporting as an unusual event a situation which exists at Oconee Nuclear Str. tion.
The unusual event concerns the fact that liquid and gas waste. management systems are processing larger volumes of fluids than were estimated in Chapter 11 1
of the Final Safety Analysis Report.
The basic waste management problems are briefly summarized as follows:
1.
Due to mixing of volumes of water containing no radioactivity from m!scellaneous sources with the small quantities of low level waste water, composite volumes of liquid to be treated as radioactive waste are greater than that identified in Table 11-la of the Final Safety Analysis Report.
/
2.
Volumes of gaseous waste, due to the nitrogen overblanket on certain tanks, are substantially higher than those predicted in Table Il-la of the Final Safety Analysis Report.
3 Boron and other chemicals sometimes present in the liquid waste complicate the ability to discharge those wastes that are otherwise within Technical Specification limits.
4.
The existing waste management systems are not operating at their full expected capacities.
in order to assess the extent of the waste handling problems and determine solutions, a waste management task force was appointed consisting of engineering, production, end station personnel.
The task force has made recommendations concerning the liquid waste handling, and Duke is pro-M) 7900
=- :- - - -
c f
,j r.
Mr. Angelo Giambusso Page 2 October 26, 1973 ceeding concurrently with efforts in the four following areas:
1.
Provide Interim Waste Management Facilities We are proceeding to design, procure and install interim waste manage-ment facilities to give us reasonable assurance that Oconee 3 can be operated satisfactorily.
The interim facilities may include a 15 spm evaporator, a demineralizer tank and associated piping.
The estimated j
date for completion of the Interim facilities is May 1,1974.
Based on this schedule and the fact that these are interim facilities, the design of the system may not be in accordance with all design criteria and code requirements which would be provided in a permanent facility.
However, piping, valves, and associated components will be procured and installed consistent with the power piping code ANSI B31.1-1973 2.
Provide Additional Permanent Waste Management Facilities Preliminary plans indicate that two evaporators of 25 gpm capacity each, a gas stripper, two demineralizers, a drumming station, tankage, and associated piping and controls may be necessary to completely solve the waste management problems and give us adequate margins to cope with all conditions. A separate building will be required to house these facilities.
This facility would be designed in accordance with criteria consistent with that for the existing waste management system. The estimated date for completion is January 1, 1976.
3.
Improve Operation of the Existing System Studies and tests will be continuing in order to improve the operation of the existing installed systems. We estimate that a majority of this work can be completed by January 1, 1974.
4.
Separation of Non-Radioactive Waste Water fron Lontaminated Areas Studies will continue to attempt to isolate non-radioactive waste from contaminated waste.
While the waste management problems at the station caused by handling larger volumes of fluids have been significant at times, improvement in the operation of the waste management system has been accomplished.
For instance, low level liquid waste volumes were being generated at rates as high as 14,000 gallons per day during August and September of 1973.
Due to successful efforts to decrease secondary side leakage, liquid wastes are currently being generated at the rate of 7,000 gallons per day for Units I and 2 (7,000 gallons per day is equivalent to approxi-mately 5 gallons per minute).
._ _ _ _ _ _. - _ __ _ i
~~
,c.
~
Mr. Angelo Giambusso
'Page 3 October 26, 1973 it should be emphasized that although unexpected quantities of liquid
.i and gaseous wastes have been collected and processed, the radioactive releases have been low and well within the limits of Technical Specifi-cations 3.9 and 3 10. We will advise you of'our progress in solving this problem.
Very truly yours, A. C. Thies ACT:vr cc: