Forwards Insp Rept 50-269/74-01 on 740122-25.Violations Noted
ML19308A638
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 02/21/1974
From: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Thies A
DUKE POWER CO.
Shared Package
ML19308A639 List:
References
NUDOCS 7911270811
Download: ML19308A638 (2)


See also: IR 05000269/1974001

Text

.7

.

s

a

%s.

UNITED STATES

..r-i\\%j

ATOMIC ENERGY COMMISSION

P M Ils M N N K'M

' A.j ip,J.

D rE T/' ' C.S ,o" 4

'

e

neo

n

soit e. No

t

j

O . Ier, A r_ pe r s4 t E S t 83,. E T . 4 0 H T ** d' E ** f

g,gge

o.g.

ta t 4 8 ,2 4 4 9 03

f. t t, a w r A , G l oH G i A >DC3

In Reply Refer To:

FEB 211974

PO:II:FJ

<

50-269/74-1

.

Duke Power Company

ATTN:

Mr. A. C. Thies, Senior Vice President

Production and Transmission

Pcwer Building

422 South Church Street

Charlotte, North Carolina

28201

Gentlecen:

This refers to the inspection conducted by Mr. F. Jape of this office

on January 22-25, 1974, of activities authori::ed by AEC Operating

License No. DPR-38 for the Oconee 1 facility, and to the discussion

of our findings held by Mr. Jape with Mr. J. E. Smith at the conclusion

of the inspection,

Areas exanined dur'ing the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted

of selective exanination of procedures and representative records,

,

interviews with personnel, and observations by the inspector.

During the inspection it was found that certain activities under your

license appear to be in violation of AEC requirements.

The violation

and references to pertinent requirements are listed in Section I of

the su= mary of the enclosed report. No response is required for

violations listed under I. A.a. , d. and e. since these catters were

resolved and your corrective actions verified during the inspection.

With regard to violations listed under I.A.b. and c. , Section 2.201 of

the AEC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations, requires that you submit within 20 days, in writing,

your co= cents concerning these itees, a description of any steps that

have been or will be taken to correct these itees, a description of any

steps that have been or .d;. be taken to prevent recurrence, and the

date the corrective acticiu

r preventive measures were or will be

completed.

7911SN

. _ - _.

,

.

.

.

I

Duke Power Company

-2-

FEB 211974

\\q ' ,

'

, _ .

In accordance with Section i 4 A of the AEC's " Rules of Practice," Part 2,

Title 10, code of Federal Rc ,alations, a copy of this letter and the

e

enclosed inspection report will we placed in the AEC's Public Document

Room.

If this report cor*ains any information that you believe to be

iy that you submit a written application to

proprietary, it is ner

t

this office requesting that such information be withheld from public

disclosure.

If no proprietary information is identified, a written

statement to that effect should be submitted.

If an application is

submitted, it must fully identify the bases for which information is

claimed to be proprietary.

The application should be prepared so that

information sought to be withheld is incorporated in a separate paper

and referenced in the application since the application will be placed

in the Public Document Room. Your application, or written statement,

should be submitted to us within 20 days.

If we are not contacted as

specified, the enclosed report and this letter may then be placed in the

Public Document Room.

Should you have any questions concerning r.his letter, we will be glad

to discuss them with you.

Very truly yours,

'

'

,

..

)

(m<s'r

'

r-

Norman C. Moseley

V

'

Director

Enclosure:

RO Inspection Report No.

50-269/74-1

cc w/ encl:

J. E. Smith,

Plant Superintendent

Box 1175

Seneca, South Ccrolina 29678